{"title":"煤矿连续脱柱盘有效崩落爆破模式设计——以煤矿连续脱柱盘为例","authors":"P. Pal Roy, C. Sawmliana, R. Singh","doi":"10.1080/25726668.2021.1959750","DOIUrl":null,"url":null,"abstract":"ABSTRACT An innovative scheme of induced caving by blasting was adopted in the depillaring continuous miner panel CM1 of Jhanjra Colliery of Eastern Coalfields Limited, a subsidiary of Coal India Limited. Initially, the blasting pattern was designed with respect to underground workings and later with respect to the surface, vertically above the panel, to facilitate effective caving. The natural caving was delayed due to the presence of three hard-rock beds of more than 5000 cavability index in the immediate roof of the R-VI seam in addition to the oversized left-out standing pillars kept during coal extraction in the panel, which provided extra supports to the hanging roof-rock in the goaf. To mitigate the situation, the design parameters were meticulously planned and implemented for successful blasting operations, which led to effective caving in the goaf and enabled successful extraction of the coal from the panel maintaining the required level of safety and productivity.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"29 1","pages":"209 - 220"},"PeriodicalIF":1.8000,"publicationDate":"2021-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Design of blasting patterns to induce effective caving in continuous miner depillaring panel – a case study\",\"authors\":\"P. Pal Roy, C. Sawmliana, R. Singh\",\"doi\":\"10.1080/25726668.2021.1959750\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT An innovative scheme of induced caving by blasting was adopted in the depillaring continuous miner panel CM1 of Jhanjra Colliery of Eastern Coalfields Limited, a subsidiary of Coal India Limited. Initially, the blasting pattern was designed with respect to underground workings and later with respect to the surface, vertically above the panel, to facilitate effective caving. The natural caving was delayed due to the presence of three hard-rock beds of more than 5000 cavability index in the immediate roof of the R-VI seam in addition to the oversized left-out standing pillars kept during coal extraction in the panel, which provided extra supports to the hanging roof-rock in the goaf. To mitigate the situation, the design parameters were meticulously planned and implemented for successful blasting operations, which led to effective caving in the goaf and enabled successful extraction of the coal from the panel maintaining the required level of safety and productivity.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":\"29 1\",\"pages\":\"209 - 220\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-10-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2021.1959750\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1959750","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
Design of blasting patterns to induce effective caving in continuous miner depillaring panel – a case study
ABSTRACT An innovative scheme of induced caving by blasting was adopted in the depillaring continuous miner panel CM1 of Jhanjra Colliery of Eastern Coalfields Limited, a subsidiary of Coal India Limited. Initially, the blasting pattern was designed with respect to underground workings and later with respect to the surface, vertically above the panel, to facilitate effective caving. The natural caving was delayed due to the presence of three hard-rock beds of more than 5000 cavability index in the immediate roof of the R-VI seam in addition to the oversized left-out standing pillars kept during coal extraction in the panel, which provided extra supports to the hanging roof-rock in the goaf. To mitigate the situation, the design parameters were meticulously planned and implemented for successful blasting operations, which led to effective caving in the goaf and enabled successful extraction of the coal from the panel maintaining the required level of safety and productivity.