{"title":"巴约讷大桥:抬高道路","authors":"Matthew Spoth, Roger Q. Haight","doi":"10.1680/jbren.21.00069","DOIUrl":null,"url":null,"abstract":"The Port Authority of New York & New Jersey's Bayonne Bridge crosses the entrance to the Ports of Newark and Elizabeth, New Jersey. The longest steel truss arch span in the world when it opened in 1931, the bridge was designed by Othmar Ammann. To maintain the economic vitality of the ports, the original 46 m navigational clearance needed to be raised to 65.5 m to accommodate mega container ships passing through the newly widened Panama Canal. Precast concrete segmental construction was used along with an innovative staged construction approach to avoid long term bridge closures and to expedite the construction schedule. The new navigational clearance was attained in 2017 and project completion occurred in mid-2019.","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"71 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bayonne Bridge: Raising the Roadway\",\"authors\":\"Matthew Spoth, Roger Q. Haight\",\"doi\":\"10.1680/jbren.21.00069\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Port Authority of New York & New Jersey's Bayonne Bridge crosses the entrance to the Ports of Newark and Elizabeth, New Jersey. The longest steel truss arch span in the world when it opened in 1931, the bridge was designed by Othmar Ammann. To maintain the economic vitality of the ports, the original 46 m navigational clearance needed to be raised to 65.5 m to accommodate mega container ships passing through the newly widened Panama Canal. Precast concrete segmental construction was used along with an innovative staged construction approach to avoid long term bridge closures and to expedite the construction schedule. The new navigational clearance was attained in 2017 and project completion occurred in mid-2019.\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"71 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-09-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jbren.21.00069\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

纽约和新泽西港务局的巴约讷大桥横跨纽瓦克港和新泽西州伊丽莎白港的入口。这座桥是世界上最长的钢桁架拱桥,于1931年开放,由奥斯曼·阿曼(Othmar Ammann)设计。为了保持港口的经济活力,需要将原来的46米通航间隙提高到65.5米,以容纳通过新拓宽的巴拿马运河的大型集装箱船。预制混凝土分段施工采用了创新的分段施工方法,避免了长期的桥梁封闭,加快了施工进度。新的航行许可于2017年获得,项目于2019年年中完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bayonne Bridge: Raising the Roadway
The Port Authority of New York & New Jersey's Bayonne Bridge crosses the entrance to the Ports of Newark and Elizabeth, New Jersey. The longest steel truss arch span in the world when it opened in 1931, the bridge was designed by Othmar Ammann. To maintain the economic vitality of the ports, the original 46 m navigational clearance needed to be raised to 65.5 m to accommodate mega container ships passing through the newly widened Panama Canal. Precast concrete segmental construction was used along with an innovative staged construction approach to avoid long term bridge closures and to expedite the construction schedule. The new navigational clearance was attained in 2017 and project completion occurred in mid-2019.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信