触变凝胶和混合电-光纤电缆连续油管技术在复杂裂缝碳酸盐地层中成功进行层间隔离

P. Pollio, Gianluca Fortunato, Salvatore Spagnolo, Gianni Baldassarri, P. Cappuccio, V. Mittiga, R. Cherri, M. Colombo, Salvatore Privitera, Riccardo Caldarelli, M. Ridenti, Y. Santin, J. Vasquez, Danilo Appicciutoli
{"title":"触变凝胶和混合电-光纤电缆连续油管技术在复杂裂缝碳酸盐地层中成功进行层间隔离","authors":"P. Pollio, Gianluca Fortunato, Salvatore Spagnolo, Gianni Baldassarri, P. Cappuccio, V. Mittiga, R. Cherri, M. Colombo, Salvatore Privitera, Riccardo Caldarelli, M. Ridenti, Y. Santin, J. Vasquez, Danilo Appicciutoli","doi":"10.2118/207447-ms","DOIUrl":null,"url":null,"abstract":"\n Water production has always afflicted mature fields due to the uneconomical nature of high water cut (WC) wells and the high cost of water management. Rigless coiled tubing (CT) interventions with increasingly articulated operating procedures are the key to a successful water reduction. In the scenario presented in this paper, high technological through tubing water shut off (WSO) for a long horizontal open hole (OH) well in a naturally fractured carbonate reservoir leads the way to new opportunities of production optimization.\n Engineering phase included sealant fluid re-design: the peculiar well architecture and fracture systems led to the customization of a sealant gel by modifying its rheological properties through laboratory tests, to improve effectiveness of worksite operations.\n A new ad-hoc procedure was defined, with a new selective pumping and testing technique tailored to each drain fracture.\n The use of Real-Time Hybrid Coiled Tubing Services (CT with fiber optic system coupled with real time capabilities of an electric cable) made it possible to optimize intervention reliability.\n Details of the operating procedure are given, with the aim of ensuring a successful outcome of the overall treatment\n Sealing gels are effective in plugging the formation, but in fractured environments the risk of losing the product before it starts to build viscosity is high.\n The success of the water shut off job has been obtained by using specific gel with thixotropic properties for an effective placement.\n In addition, the pumping has been performed in steps, each followed by a pressure test to assess the effectiveness of the plugging.\n Results are compared to two past interventions with equal scope in the same well: a first one with high volume of gel and an unoptimized pumping technique through CT and a second where a water reactive product was pumped by bullheading.\n The selective and repetitive approach pumping multiple batches of sealant system with CT stationary in front of a single fracture provided the best results from all three techniques.\n The real-time bottom hole data reading capability provided by hybrid CT allowed the placement of thru tubing bridge plugs (BP) with high accuracy and confidence with the ability to set electrically, therefore reducing risks related to hydraulic setting tools (i.e. premature setting). This also allows continual pumping during the run in hole (RIH) to clean up the zone prior to setting the BP.\n The combination of this innovative pumping technique and customization of the sealant fluid made it possible to achieve unprecedented water reduction in the field.\n The high technology CT supported the operation by providing continuous power and telemetry to the bottom hole assembly (BHA) for real time (RT) downhole diagnostics.\n Moreover, the operating procedures offer basic guidelines to successfully perform water shut off jobs in any other reservoir independent of its geological nature and structure.","PeriodicalId":10967,"journal":{"name":"Day 1 Mon, November 15, 2021","volume":"4 3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Successful Zonal Isolation in Complex Fractured Carbonate Scenario Using Thixotropic Gel and Hybrid Electric-Fiber Cable Coiled Tubing Technology\",\"authors\":\"P. Pollio, Gianluca Fortunato, Salvatore Spagnolo, Gianni Baldassarri, P. Cappuccio, V. Mittiga, R. Cherri, M. Colombo, Salvatore Privitera, Riccardo Caldarelli, M. Ridenti, Y. Santin, J. Vasquez, Danilo Appicciutoli\",\"doi\":\"10.2118/207447-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Water production has always afflicted mature fields due to the uneconomical nature of high water cut (WC) wells and the high cost of water management. Rigless coiled tubing (CT) interventions with increasingly articulated operating procedures are the key to a successful water reduction. In the scenario presented in this paper, high technological through tubing water shut off (WSO) for a long horizontal open hole (OH) well in a naturally fractured carbonate reservoir leads the way to new opportunities of production optimization.\\n Engineering phase included sealant fluid re-design: the peculiar well architecture and fracture systems led to the customization of a sealant gel by modifying its rheological properties through laboratory tests, to improve effectiveness of worksite operations.\\n A new ad-hoc procedure was defined, with a new selective pumping and testing technique tailored to each drain fracture.\\n The use of Real-Time Hybrid Coiled Tubing Services (CT with fiber optic system coupled with real time capabilities of an electric cable) made it possible to optimize intervention reliability.\\n Details of the operating procedure are given, with the aim of ensuring a successful outcome of the overall treatment\\n Sealing gels are effective in plugging the formation, but in fractured environments the risk of losing the product before it starts to build viscosity is high.\\n The success of the water shut off job has been obtained by using specific gel with thixotropic properties for an effective placement.\\n In addition, the pumping has been performed in steps, each followed by a pressure test to assess the effectiveness of the plugging.\\n Results are compared to two past interventions with equal scope in the same well: a first one with high volume of gel and an unoptimized pumping technique through CT and a second where a water reactive product was pumped by bullheading.\\n The selective and repetitive approach pumping multiple batches of sealant system with CT stationary in front of a single fracture provided the best results from all three techniques.\\n The real-time bottom hole data reading capability provided by hybrid CT allowed the placement of thru tubing bridge plugs (BP) with high accuracy and confidence with the ability to set electrically, therefore reducing risks related to hydraulic setting tools (i.e. premature setting). This also allows continual pumping during the run in hole (RIH) to clean up the zone prior to setting the BP.\\n The combination of this innovative pumping technique and customization of the sealant fluid made it possible to achieve unprecedented water reduction in the field.\\n The high technology CT supported the operation by providing continuous power and telemetry to the bottom hole assembly (BHA) for real time (RT) downhole diagnostics.\\n Moreover, the operating procedures offer basic guidelines to successfully perform water shut off jobs in any other reservoir independent of its geological nature and structure.\",\"PeriodicalId\":10967,\"journal\":{\"name\":\"Day 1 Mon, November 15, 2021\",\"volume\":\"4 3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, November 15, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207447-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 15, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207447-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于高含水井的不经济性和水管理成本高,一直困扰着成熟油田的产水问题。无钻机连续油管(CT)干预与越来越多的作业程序是成功减水的关键。在本文提出的方案中,针对天然裂缝性碳酸盐岩储层中的长水平裸眼井,采用高技术的油管关水(WSO)技术为优化生产带来了新的机遇。工程阶段包括密封胶液的重新设计:特殊的井结构和压裂系统通过实验室测试改变其流变特性,从而定制密封胶凝胶,以提高现场作业的效率。他们定义了一种新的特殊程序,针对每个泄油裂缝定制了新的选择性泵送和测试技术。使用实时混合连续油管服务(CT与光纤系统结合电缆的实时能力)可以优化修井作业的可靠性。为了确保整个处理过程的成功,给出了详细的操作步骤。密封凝胶在封堵地层方面是有效的,但在压裂环境中,在产品开始形成粘度之前丢失产品的风险很高。通过使用具有触变特性的特定凝胶进行有效放置,堵水作业取得了成功。此外,泵送是分阶段进行的,每一步都进行压力测试,以评估封堵的有效性。研究人员将结果与过去在同一口井中进行的两次相同范围的干预进行了比较:第一次使用了大量凝胶和未经优化的连续油管泵送技术,第二次使用了压头泵送水反应产物。选择性地、重复地泵入多批次密封胶系统,并在单个裂缝前固定CT,这三种技术的效果都是最好的。混合动力CT提供的实时井底数据读取能力使得通过油管桥塞(BP)的放置具有高精度和可靠性,并且能够进行电动坐封,因此降低了与液压坐封工具相关的风险(即过早坐封)。这也允许在井内下入(RIH)期间持续泵送,以在设置BP之前清理该区域。这种创新的泵送技术与定制的密封液相结合,使油田实现了前所未有的减水效果。高科技CT通过为底部钻具组合(BHA)提供持续的动力和遥测技术来支持作业,从而实现实时(RT)井下诊断。此外,作业程序提供了基本的指导方针,可以在任何其他油藏中成功执行堵水作业,而不受其地质性质和结构的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Successful Zonal Isolation in Complex Fractured Carbonate Scenario Using Thixotropic Gel and Hybrid Electric-Fiber Cable Coiled Tubing Technology
Water production has always afflicted mature fields due to the uneconomical nature of high water cut (WC) wells and the high cost of water management. Rigless coiled tubing (CT) interventions with increasingly articulated operating procedures are the key to a successful water reduction. In the scenario presented in this paper, high technological through tubing water shut off (WSO) for a long horizontal open hole (OH) well in a naturally fractured carbonate reservoir leads the way to new opportunities of production optimization. Engineering phase included sealant fluid re-design: the peculiar well architecture and fracture systems led to the customization of a sealant gel by modifying its rheological properties through laboratory tests, to improve effectiveness of worksite operations. A new ad-hoc procedure was defined, with a new selective pumping and testing technique tailored to each drain fracture. The use of Real-Time Hybrid Coiled Tubing Services (CT with fiber optic system coupled with real time capabilities of an electric cable) made it possible to optimize intervention reliability. Details of the operating procedure are given, with the aim of ensuring a successful outcome of the overall treatment Sealing gels are effective in plugging the formation, but in fractured environments the risk of losing the product before it starts to build viscosity is high. The success of the water shut off job has been obtained by using specific gel with thixotropic properties for an effective placement. In addition, the pumping has been performed in steps, each followed by a pressure test to assess the effectiveness of the plugging. Results are compared to two past interventions with equal scope in the same well: a first one with high volume of gel and an unoptimized pumping technique through CT and a second where a water reactive product was pumped by bullheading. The selective and repetitive approach pumping multiple batches of sealant system with CT stationary in front of a single fracture provided the best results from all three techniques. The real-time bottom hole data reading capability provided by hybrid CT allowed the placement of thru tubing bridge plugs (BP) with high accuracy and confidence with the ability to set electrically, therefore reducing risks related to hydraulic setting tools (i.e. premature setting). This also allows continual pumping during the run in hole (RIH) to clean up the zone prior to setting the BP. The combination of this innovative pumping technique and customization of the sealant fluid made it possible to achieve unprecedented water reduction in the field. The high technology CT supported the operation by providing continuous power and telemetry to the bottom hole assembly (BHA) for real time (RT) downhole diagnostics. Moreover, the operating procedures offer basic guidelines to successfully perform water shut off jobs in any other reservoir independent of its geological nature and structure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信