单机系统分层生产计划研究

Guisen Xue, Hong Zhou
{"title":"单机系统分层生产计划研究","authors":"Guisen Xue, Hong Zhou","doi":"10.1109/ICIEEM.2009.5344204","DOIUrl":null,"url":null,"abstract":"A two-tiered hierarchical production planning model with sequence-independent family setup time, including aggregate production planning (APP) and family disaggregation planning (FDP), is proposed in this paper for a multi-product, single machine production system. In APP, the constraints about inventory, backorder and regular time are revised according to practical situation; and in FDP, the resulted APP in the first period is decomposed into detailed lot sizing plan for each product family in each sub-period and is guaranteed for completion. Two types of feedback information are adopted to adjust the aggregate plan at different stages of a period. The performance of the model is validated with data from an enterprise.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":"49 1","pages":"916-919"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on hierarchical production planning for single machine systems\",\"authors\":\"Guisen Xue, Hong Zhou\",\"doi\":\"10.1109/ICIEEM.2009.5344204\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A two-tiered hierarchical production planning model with sequence-independent family setup time, including aggregate production planning (APP) and family disaggregation planning (FDP), is proposed in this paper for a multi-product, single machine production system. In APP, the constraints about inventory, backorder and regular time are revised according to practical situation; and in FDP, the resulted APP in the first period is decomposed into detailed lot sizing plan for each product family in each sub-period and is guaranteed for completion. Two types of feedback information are adopted to adjust the aggregate plan at different stages of a period. The performance of the model is validated with data from an enterprise.\",\"PeriodicalId\":6326,\"journal\":{\"name\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"49 1\",\"pages\":\"916-919\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEEM.2009.5344204\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344204","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

针对多产品单机生产系统,提出了一种具有序列无关的家族建立时间的两层分层生产计划模型,包括总体生产计划(APP)和家族分解计划(FDP)。在APP中,根据实际情况对库存约束、缺货约束和正常时间约束进行修正;在FDP中,将第一周期的结果APP分解为每个子周期的每个产品族的详细批量计划,并保证完成。在一个时间段的不同阶段,采用两种反馈信息来调整总计划。使用来自企业的数据验证模型的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on hierarchical production planning for single machine systems
A two-tiered hierarchical production planning model with sequence-independent family setup time, including aggregate production planning (APP) and family disaggregation planning (FDP), is proposed in this paper for a multi-product, single machine production system. In APP, the constraints about inventory, backorder and regular time are revised according to practical situation; and in FDP, the resulted APP in the first period is decomposed into detailed lot sizing plan for each product family in each sub-period and is guaranteed for completion. Two types of feedback information are adopted to adjust the aggregate plan at different stages of a period. The performance of the model is validated with data from an enterprise.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信