{"title":"基于PA01-AP01二次泵的RSG-GAS反应器RUL估计Weibull模型","authors":"S. Sudadiyo","doi":"10.1515/kern-2022-0080","DOIUrl":null,"url":null,"abstract":"Abstract Remaining Useful Life (RUL) estimation has been extensively explored in recent years. RUL could be used in deciding the maintenance timeline or inspection interval for the Reaktor Serba Guna – G. A. Siwabessy (RSG-GAS reactor). RSG-GAS reactor is a pool-type research reactor (built by the Interatom Internationale of Germany) and has been operating for more than 30 years to date. This study aimed to propose a Weibull model to find the RUL estimation value of the distribution parameters of the mean time to failure (MTTF). Therefore, the RSG-GAS reactor would be higher safety, longer lifetime and higher reliability with a smaller failure rate including for the PA01-AP01 secondary pump. The research methodology is processing data collection and estimating the parameters of the Weibull model to determine maintenance timeline or inspection intervals based on the MTTF value in case the reliability has reached the targeted percentage. Results show that the RUL estimation has been obtained for the RSG-GAS reactor. In the implemented study, a maintenance timeline has been stipulated for the PA01-AP01 secondary pump (with the model of KSB and type of CPK-S350-400) for the reliability of 90% and RUL estimation of circa 29 days.","PeriodicalId":17787,"journal":{"name":"Kerntechnik","volume":"22 1","pages":"194 - 202"},"PeriodicalIF":0.4000,"publicationDate":"2023-01-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Weibull model for RUL estimation at RSG-GAS reactor implemented on PA01-AP01 secondary pump\",\"authors\":\"S. Sudadiyo\",\"doi\":\"10.1515/kern-2022-0080\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Remaining Useful Life (RUL) estimation has been extensively explored in recent years. RUL could be used in deciding the maintenance timeline or inspection interval for the Reaktor Serba Guna – G. A. Siwabessy (RSG-GAS reactor). RSG-GAS reactor is a pool-type research reactor (built by the Interatom Internationale of Germany) and has been operating for more than 30 years to date. This study aimed to propose a Weibull model to find the RUL estimation value of the distribution parameters of the mean time to failure (MTTF). Therefore, the RSG-GAS reactor would be higher safety, longer lifetime and higher reliability with a smaller failure rate including for the PA01-AP01 secondary pump. The research methodology is processing data collection and estimating the parameters of the Weibull model to determine maintenance timeline or inspection intervals based on the MTTF value in case the reliability has reached the targeted percentage. Results show that the RUL estimation has been obtained for the RSG-GAS reactor. In the implemented study, a maintenance timeline has been stipulated for the PA01-AP01 secondary pump (with the model of KSB and type of CPK-S350-400) for the reliability of 90% and RUL estimation of circa 29 days.\",\"PeriodicalId\":17787,\"journal\":{\"name\":\"Kerntechnik\",\"volume\":\"22 1\",\"pages\":\"194 - 202\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-01-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Kerntechnik\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1515/kern-2022-0080\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Kerntechnik","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1515/kern-2022-0080","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

摘要剩余使用寿命(RUL)的估算是近年来研究的热点。RUL可用于确定Serba Guna - g.a. Siwabessy反应堆(RSG-GAS反应堆)的维护时间表或检查间隔。RSG-GAS反应堆是池式研究堆(由德国国际原子能机构建造),迄今已运行30多年。本研究旨在建立威布尔模型,以求平均失效时间(MTTF)分布参数的RUL估计值。因此,包括PA01-AP01二次泵在内,RSG-GAS反应器将具有更高的安全性、更长的使用寿命和更高的可靠性,故障率更小。研究方法是在可靠性达到目标百分比的情况下,对收集的数据进行处理并估计威布尔模型的参数,根据MTTF值确定维修时间表或检查间隔。结果表明,得到了RSG-GAS反应器的RUL估计。在实施的研究中,对PA01-AP01次泵(型号为KSB,型号为CPK-S350-400)规定了维护时间表,可靠性为90%,RUL估计约为29天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Weibull model for RUL estimation at RSG-GAS reactor implemented on PA01-AP01 secondary pump
Abstract Remaining Useful Life (RUL) estimation has been extensively explored in recent years. RUL could be used in deciding the maintenance timeline or inspection interval for the Reaktor Serba Guna – G. A. Siwabessy (RSG-GAS reactor). RSG-GAS reactor is a pool-type research reactor (built by the Interatom Internationale of Germany) and has been operating for more than 30 years to date. This study aimed to propose a Weibull model to find the RUL estimation value of the distribution parameters of the mean time to failure (MTTF). Therefore, the RSG-GAS reactor would be higher safety, longer lifetime and higher reliability with a smaller failure rate including for the PA01-AP01 secondary pump. The research methodology is processing data collection and estimating the parameters of the Weibull model to determine maintenance timeline or inspection intervals based on the MTTF value in case the reliability has reached the targeted percentage. Results show that the RUL estimation has been obtained for the RSG-GAS reactor. In the implemented study, a maintenance timeline has been stipulated for the PA01-AP01 secondary pump (with the model of KSB and type of CPK-S350-400) for the reliability of 90% and RUL estimation of circa 29 days.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Kerntechnik
Kerntechnik 工程技术-核科学技术
CiteScore
0.90
自引率
20.00%
发文量
72
审稿时长
6-12 weeks
期刊介绍: Kerntechnik is an independent journal for nuclear engineering (including design, operation, safety and economics of nuclear power stations, research reactors and simulators), energy systems, radiation (ionizing radiation in industry, medicine and research) and radiological protection (biological effects of ionizing radiation, the system of protection for occupational, medical and public exposures, the assessment of doses, operational protection and safety programs, management of radioactive wastes, decommissioning and regulatory requirements).
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信