I. P. Dedi Wiriastika, I. N. Setiawan, I. W. Sukerayasa
{"title":"PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA DI TEMPAT OLAH SAMPAH SETEMPAT WERDI GUNA DESA GUNAKSA KABUPATEN KLUNGKUNG","authors":"I. P. Dedi Wiriastika, I. N. Setiawan, I. W. Sukerayasa","doi":"10.24843/spektrum.2022.v09.i01.p6","DOIUrl":null,"url":null,"abstract":"The use of renewable energy is a solution in the application of clean andenvironmentally friendly energy, one of which is the use of solar power with the PLTS system. Inthis study, the PLTS system planned at TOSS Werdi Guna is a PLTS-On Grid system without abattery with a ground mounted installation, the aim is to reduce the cost of electricity bills. PLTSplanning at TOSS Werdi Guna has a capacity of 32.6kWp with a number of 86 modules anduses 1 inverter unit with a capacity of 33kW. The energy production produced by PLTS for ayear is 52,955kWh. The total investment cost required is IDR 580,469,095 with a paybackperiod of 7 years and 4 months.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i01.p6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

使用可再生能源是应用清洁环保能源的一种解决方案,其中之一是使用太阳能与PLTS系统。在这项研究中,在TOSS Werdi Guna计划的PLTS系统是一个地面安装的无电池PLTS- on电网系统,目的是降低电费成本。TOSS Werdi Guna的plts规划容量为32.6kWp,有86个模块,并使用1个容量为33kW的逆变器单元。PLTS的年发电量为52955千瓦时。总投资成本为580,469,095印尼盾,投资回收期为7年零4个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA DI TEMPAT OLAH SAMPAH SETEMPAT WERDI GUNA DESA GUNAKSA KABUPATEN KLUNGKUNG
The use of renewable energy is a solution in the application of clean andenvironmentally friendly energy, one of which is the use of solar power with the PLTS system. Inthis study, the PLTS system planned at TOSS Werdi Guna is a PLTS-On Grid system without abattery with a ground mounted installation, the aim is to reduce the cost of electricity bills. PLTSplanning at TOSS Werdi Guna has a capacity of 32.6kWp with a number of 86 modules anduses 1 inverter unit with a capacity of 33kW. The energy production produced by PLTS for ayear is 52,955kWh. The total investment cost required is IDR 580,469,095 with a paybackperiod of 7 years and 4 months.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信