F. Gamba, E. Hugot, P. Gilli, C. Salot, G. Giacomin
{"title":"介绍了“Federica”掘进机在圣马丁-拉-波特建筑工地地质事故中的成功穿越","authors":"F. Gamba, E. Hugot, P. Gilli, C. Salot, G. Giacomin","doi":"10.1201/9780429424441-395","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Presentation of the successful crossing by the “Federica” TBM of a geological accident in Saint-Martin-la-Porte construction site\",\"authors\":\"F. Gamba, E. Hugot, P. Gilli, C. Salot, G. Giacomin\",\"doi\":\"10.1201/9780429424441-395\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":69598,\"journal\":{\"name\":\"地下工程与隧道\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"地下工程与隧道\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1201/9780429424441-395\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"地下工程与隧道","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/9780429424441-395","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}