{"title":"钢筋混凝土厂房楼盖加固技术决策的预估论证","authors":"O. Rubin, A. Antonov, S. Lisichkin, I. Baklykov, Nikolay V. Bekin, K. E. Frolov","doi":"10.22227/2305-5502.2019.1.4","DOIUrl":null,"url":null,"abstract":"Introduction. In connection with the long-term operation of hydraulic structures (HPP), the installation of significant temporary loads, the presence of alternating effects on individual structural elements, it is possible to reduce the carrying capacity and strength of reinforced concrete structures. One of the most crucial elements is the reinforced concrete overlap of the machine hall, the work presents field and design studies, a proposal to strengthen the structures with external reinforcement. Materials and methods. The scientific and technical documentation was analyzed, instrumental studies and visual inspections of the state of the structures were carried out, and a 3D mathematical model was developed based on the finite element method. Multivariate non-linear computational studies of the actual stress-strain state of structures have been carried out. Results. Conducted visual and instrumental examination showed the presence of cracking on the lower edge of the reinforced concrete floor of the machine room. The simulation of the actual state of the structures has been carried out; according to the results of calculations, a schematic diagram of the gain of structures has been proposed. Conclusions. As a result of computational studies of stress-strain state, the occurrence of cracks on the lower edge of reinforced concrete floor of the machine hall was confirmed. When applying temporary technological loads to overlap, it is possible to achieve the yield strength of the reinforcement in certain zones. In order to ensure further safe operation of the structures, a conceptual amplification scheme based on the results of stress-strain state calculations has been proposed.","PeriodicalId":22024,"journal":{"name":"Stroitel stvo nauka i obrazovanie [Construction Science and Education]","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ESTIMATED JUSTIFICATION OF TECHNICAL DECISION ON STRENGTHENING REINFORCED CONCRETE MACHINE HALL FLOOR\",\"authors\":\"O. Rubin, A. Antonov, S. Lisichkin, I. Baklykov, Nikolay V. Bekin, K. E. Frolov\",\"doi\":\"10.22227/2305-5502.2019.1.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction. In connection with the long-term operation of hydraulic structures (HPP), the installation of significant temporary loads, the presence of alternating effects on individual structural elements, it is possible to reduce the carrying capacity and strength of reinforced concrete structures. One of the most crucial elements is the reinforced concrete overlap of the machine hall, the work presents field and design studies, a proposal to strengthen the structures with external reinforcement. Materials and methods. The scientific and technical documentation was analyzed, instrumental studies and visual inspections of the state of the structures were carried out, and a 3D mathematical model was developed based on the finite element method. Multivariate non-linear computational studies of the actual stress-strain state of structures have been carried out. Results. Conducted visual and instrumental examination showed the presence of cracking on the lower edge of the reinforced concrete floor of the machine room. The simulation of the actual state of the structures has been carried out; according to the results of calculations, a schematic diagram of the gain of structures has been proposed. Conclusions. As a result of computational studies of stress-strain state, the occurrence of cracks on the lower edge of reinforced concrete floor of the machine hall was confirmed. When applying temporary technological loads to overlap, it is possible to achieve the yield strength of the reinforcement in certain zones. In order to ensure further safe operation of the structures, a conceptual amplification scheme based on the results of stress-strain state calculations has been proposed.\",\"PeriodicalId\":22024,\"journal\":{\"name\":\"Stroitel stvo nauka i obrazovanie [Construction Science and Education]\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Stroitel stvo nauka i obrazovanie [Construction Science and Education]\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22227/2305-5502.2019.1.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Stroitel stvo nauka i obrazovanie [Construction Science and Education]","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22227/2305-5502.2019.1.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
ESTIMATED JUSTIFICATION OF TECHNICAL DECISION ON STRENGTHENING REINFORCED CONCRETE MACHINE HALL FLOOR
Introduction. In connection with the long-term operation of hydraulic structures (HPP), the installation of significant temporary loads, the presence of alternating effects on individual structural elements, it is possible to reduce the carrying capacity and strength of reinforced concrete structures. One of the most crucial elements is the reinforced concrete overlap of the machine hall, the work presents field and design studies, a proposal to strengthen the structures with external reinforcement. Materials and methods. The scientific and technical documentation was analyzed, instrumental studies and visual inspections of the state of the structures were carried out, and a 3D mathematical model was developed based on the finite element method. Multivariate non-linear computational studies of the actual stress-strain state of structures have been carried out. Results. Conducted visual and instrumental examination showed the presence of cracking on the lower edge of the reinforced concrete floor of the machine room. The simulation of the actual state of the structures has been carried out; according to the results of calculations, a schematic diagram of the gain of structures has been proposed. Conclusions. As a result of computational studies of stress-strain state, the occurrence of cracks on the lower edge of reinforced concrete floor of the machine hall was confirmed. When applying temporary technological loads to overlap, it is possible to achieve the yield strength of the reinforcement in certain zones. In order to ensure further safe operation of the structures, a conceptual amplification scheme based on the results of stress-strain state calculations has been proposed.