{"title":"模块化光伏发电系统最大功率点协调跟踪","authors":"Nicolette Ann A. Arriola, M. Ramos","doi":"10.1109/TENCON.2015.7372895","DOIUrl":null,"url":null,"abstract":"Typically, photovoltaic (PV) systems are implemented as modular systems. Two major challenges in implementing PV systems is partial shading and transient irradiance conditions, while the structure of modular systems are prone to uneven degradation of modules when load sharing is not managed. In this study, a modular photovoltaic system was built wherein each module has an independent array of series-strung panels, and the system output is loaded with a 48-V battery bank and a constant DC load. The implementation of a DC communications bus in the system, for coordination among modules, was demonstrated to be advantageous in speed of recovery from transient irradiance changes during maximum power point tracking, as well as in load sharing control.","PeriodicalId":22200,"journal":{"name":"TENCON 2015 - 2015 IEEE Region 10 Conference","volume":"247 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Coordinated maximum power point tracking in modular photovoltaic power systems\",\"authors\":\"Nicolette Ann A. Arriola, M. Ramos\",\"doi\":\"10.1109/TENCON.2015.7372895\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Typically, photovoltaic (PV) systems are implemented as modular systems. Two major challenges in implementing PV systems is partial shading and transient irradiance conditions, while the structure of modular systems are prone to uneven degradation of modules when load sharing is not managed. In this study, a modular photovoltaic system was built wherein each module has an independent array of series-strung panels, and the system output is loaded with a 48-V battery bank and a constant DC load. The implementation of a DC communications bus in the system, for coordination among modules, was demonstrated to be advantageous in speed of recovery from transient irradiance changes during maximum power point tracking, as well as in load sharing control.\",\"PeriodicalId\":22200,\"journal\":{\"name\":\"TENCON 2015 - 2015 IEEE Region 10 Conference\",\"volume\":\"247 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"TENCON 2015 - 2015 IEEE Region 10 Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TENCON.2015.7372895\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"TENCON 2015 - 2015 IEEE Region 10 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TENCON.2015.7372895","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Coordinated maximum power point tracking in modular photovoltaic power systems
Typically, photovoltaic (PV) systems are implemented as modular systems. Two major challenges in implementing PV systems is partial shading and transient irradiance conditions, while the structure of modular systems are prone to uneven degradation of modules when load sharing is not managed. In this study, a modular photovoltaic system was built wherein each module has an independent array of series-strung panels, and the system output is loaded with a 48-V battery bank and a constant DC load. The implementation of a DC communications bus in the system, for coordination among modules, was demonstrated to be advantageous in speed of recovery from transient irradiance changes during maximum power point tracking, as well as in load sharing control.