{"title":"苏拉威西中部帕卢流域邦加河沉积控制研究","authors":"Fanny Aliza Savitri, Mohammad Bagus Adityawan, Widyaningtias Widyaningtias","doi":"10.5614/jts.2023.30.2.3","DOIUrl":null,"url":null,"abstract":"Abstract. \nBangga River is located in a mountainous area in the Palu River Basin with an area of 74.82 km2 and a river lengthof 16.97 km. Flood with the approximated water depth of 3 m occur in Bangga’s Village. The cliffs upstream of theBangga River areunstable and can easily collapse due to the disaster. Ministry of Public Works and Housingcontrol through Sabo dam’s structure. This study aims to analyze the performance of sabo dam’s structure inreducing sediments and the floods. Analysis and modeling using two scenarios, before and after the sabo damstructure’s control was built, using HEC-RAS Software with purposeful 1D modeling to simulate flow patterns, totalsediment. The HEC-RAS simulation shows that the water surface is stood at 2.1 m depth in the existing condition.Sabo dam structure can reduce of sediment transport, which was computed according to Engelund (81%reduction), Mayer Peter Muller (MPM) with 92% reduction, and Yang (91% sediment yields reduction). So, thesabo dam's structure is not merely utilized to retain the sediment, but it can reduce potential flooding in the future.Keywords: Sedimentation, sediment control building, HEC-RAS, sabo dam, flood. \nAbstrak. \nSungai Bangga terletak di daerah pegunungan di DAS Palu dengan luas 74,82 km2 dan memiliki panjang sungai16,97 km. Banjir dengan kedalaman air + 3 m terjadi di Desa Bangga. Tebing-tebing di hulu Sungai Bangga tidakstabil dan mudah runtuh akibat bencana. Kementerian Pekerjaan Umum dan Perumahan Rakyat mengontrolmelalui bangunan Sabo dam. Penelitian ini bertujuan untuk menganalisis kinerja bangunan Sabo dam dalammereduksi sedimen dan banjir. Analisis dan pemodelan dilakukan dengan dua skenario yaitu sebelum dan sesudahbangunan sabo dam terbangun, menggunakan Software HEC-RAS dengan pemodelan 1D yang bertujuan untukmensimulasikan pola aliran dan total sedimen. Simulasi HEC-RAS menunjukkan bahwa kedalaman air beradapada 2,1 m pada kondisi eksisting. Bangunan sabo dam dapat mereduksi transpor sedimen, yang dihitung menurutbeberap rumus yaitu Engelund (reduksi 81%), Mayer Peter Muller (MPM) dengan reduksi 92%, dan Yang (reduksi91%). Jadi, bangunan sabo dam tidak hanya dimanfaatkan untuk menahan sedimen, tetapi dapat mengurangipotensi banjir di masa depan. \nKata-kata kunci: Sedimentasi, bangunan pengontrol sedimen, HEC-RAS, sabo dam, banjir.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study of Sedimentation Control on Bangga River, Palu Watershed, Central Sulawesi\",\"authors\":\"Fanny Aliza Savitri, Mohammad Bagus Adityawan, Widyaningtias Widyaningtias\",\"doi\":\"10.5614/jts.2023.30.2.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract. \\nBangga River is located in a mountainous area in the Palu River Basin with an area of 74.82 km2 and a river lengthof 16.97 km. Flood with the approximated water depth of 3 m occur in Bangga’s Village. The cliffs upstream of theBangga River areunstable and can easily collapse due to the disaster. Ministry of Public Works and Housingcontrol through Sabo dam’s structure. This study aims to analyze the performance of sabo dam’s structure inreducing sediments and the floods. Analysis and modeling using two scenarios, before and after the sabo damstructure’s control was built, using HEC-RAS Software with purposeful 1D modeling to simulate flow patterns, totalsediment. The HEC-RAS simulation shows that the water surface is stood at 2.1 m depth in the existing condition.Sabo dam structure can reduce of sediment transport, which was computed according to Engelund (81%reduction), Mayer Peter Muller (MPM) with 92% reduction, and Yang (91% sediment yields reduction). So, thesabo dam's structure is not merely utilized to retain the sediment, but it can reduce potential flooding in the future.Keywords: Sedimentation, sediment control building, HEC-RAS, sabo dam, flood. \\nAbstrak. \\nSungai Bangga terletak di daerah pegunungan di DAS Palu dengan luas 74,82 km2 dan memiliki panjang sungai16,97 km. Banjir dengan kedalaman air + 3 m terjadi di Desa Bangga. Tebing-tebing di hulu Sungai Bangga tidakstabil dan mudah runtuh akibat bencana. Kementerian Pekerjaan Umum dan Perumahan Rakyat mengontrolmelalui bangunan Sabo dam. Penelitian ini bertujuan untuk menganalisis kinerja bangunan Sabo dam dalammereduksi sedimen dan banjir. Analisis dan pemodelan dilakukan dengan dua skenario yaitu sebelum dan sesudahbangunan sabo dam terbangun, menggunakan Software HEC-RAS dengan pemodelan 1D yang bertujuan untukmensimulasikan pola aliran dan total sedimen. Simulasi HEC-RAS menunjukkan bahwa kedalaman air beradapada 2,1 m pada kondisi eksisting. Bangunan sabo dam dapat mereduksi transpor sedimen, yang dihitung menurutbeberap rumus yaitu Engelund (reduksi 81%), Mayer Peter Muller (MPM) dengan reduksi 92%, dan Yang (reduksi91%). Jadi, bangunan sabo dam tidak hanya dimanfaatkan untuk menahan sedimen, tetapi dapat mengurangipotensi banjir di masa depan. \\nKata-kata kunci: Sedimentasi, bangunan pengontrol sedimen, HEC-RAS, sabo dam, banjir.\",\"PeriodicalId\":52838,\"journal\":{\"name\":\"Jurnal Teknik Sipil\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5614/jts.2023.30.2.3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5614/jts.2023.30.2.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要邦加河位于帕卢河流域的山区,面积74.82平方公里,河长16.97公里。邦加村发生洪水,水深约3米。邦加河上游的悬崖不稳定,很容易因灾难而倒塌。公共工程和住房部通过Sabo大坝的结构进行控制。本研究旨在分析沙波坝结构在减少泥沙和洪水方面的性能。利用HEC-RAS软件,采用有目的的一维建模方法,对沙坝控制前后两种情景进行了分析和建模。HEC-RAS模拟结果表明,在现有条件下,水面深度为2.1 m。Sabo坝结构可以减少输沙量,根据Engelund(减少81%),Mayer Peter Muller (MPM)(减少92%)和Yang(减少91%)计算。因此,萨博大坝的结构不仅可以用来保留沉积物,还可以减少未来可能发生的洪水。关键词:泥沙,控沙建筑,HEC-RAS,沙波坝,洪水Abstrak。Sungai Bangga terletak di daerah pegunungan di DAS Palu dengan luas 74,82平方公里dan memiliki panjang sunga16,97公里。Banjir dengan kedalaman air + 3 m terjadi di Desa Bangga。Tebing-tebing di hulu Sungai Bangga tidakstabil dan mudah runtuh akibat bencana。马来西亚人民政府(Kementerian Pekerjaan Umum dan Perumahan Rakyat mengontrolmelalui bangunan Sabo dam)。Penelitian ini bertujuan untuk menganalis kinerja bangunan Sabo dam dalammerduksi sedimen dan banjir。分析dan pemodelan dilakukan dengan dua skenario yitu sebelum danesudahbangunan sabo dam terbangun, menggunakan软件HEC-RAS dengan pemodelan 1D yang bertujuan untukmensimulasikan polakiran总沉积。Simulasi HEC-RAS menunjukkan bahwa kedalaman air beradapada 2,1 m paada kondisi存在。Bangunan sabo dam dapat merduksi转运沉积,yang dihitung menuutbeberap rumus yitu Engelund (reduksi 81%), Mayer Peter Muller (MPM) dengan reduksi 92%, dan yang (reduksi91%)。Jadi, bangunan sabo dam tidak hanya dimanfaatkan untuk menahan沉积物,tetapi dapat mengurangangpotensi banjir di masa depan。Kata-kata kunci:沉积,bangunan pengcontrol沉积岩,HEC-RAS, sabo坝,banjir。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study of Sedimentation Control on Bangga River, Palu Watershed, Central Sulawesi
Abstract. Bangga River is located in a mountainous area in the Palu River Basin with an area of 74.82 km2 and a river lengthof 16.97 km. Flood with the approximated water depth of 3 m occur in Bangga’s Village. The cliffs upstream of theBangga River areunstable and can easily collapse due to the disaster. Ministry of Public Works and Housingcontrol through Sabo dam’s structure. This study aims to analyze the performance of sabo dam’s structure inreducing sediments and the floods. Analysis and modeling using two scenarios, before and after the sabo damstructure’s control was built, using HEC-RAS Software with purposeful 1D modeling to simulate flow patterns, totalsediment. The HEC-RAS simulation shows that the water surface is stood at 2.1 m depth in the existing condition.Sabo dam structure can reduce of sediment transport, which was computed according to Engelund (81%reduction), Mayer Peter Muller (MPM) with 92% reduction, and Yang (91% sediment yields reduction). So, thesabo dam's structure is not merely utilized to retain the sediment, but it can reduce potential flooding in the future.Keywords: Sedimentation, sediment control building, HEC-RAS, sabo dam, flood. Abstrak. Sungai Bangga terletak di daerah pegunungan di DAS Palu dengan luas 74,82 km2 dan memiliki panjang sungai16,97 km. Banjir dengan kedalaman air + 3 m terjadi di Desa Bangga. Tebing-tebing di hulu Sungai Bangga tidakstabil dan mudah runtuh akibat bencana. Kementerian Pekerjaan Umum dan Perumahan Rakyat mengontrolmelalui bangunan Sabo dam. Penelitian ini bertujuan untuk menganalisis kinerja bangunan Sabo dam dalammereduksi sedimen dan banjir. Analisis dan pemodelan dilakukan dengan dua skenario yaitu sebelum dan sesudahbangunan sabo dam terbangun, menggunakan Software HEC-RAS dengan pemodelan 1D yang bertujuan untukmensimulasikan pola aliran dan total sedimen. Simulasi HEC-RAS menunjukkan bahwa kedalaman air beradapada 2,1 m pada kondisi eksisting. Bangunan sabo dam dapat mereduksi transpor sedimen, yang dihitung menurutbeberap rumus yaitu Engelund (reduksi 81%), Mayer Peter Muller (MPM) dengan reduksi 92%, dan Yang (reduksi91%). Jadi, bangunan sabo dam tidak hanya dimanfaatkan untuk menahan sedimen, tetapi dapat mengurangipotensi banjir di masa depan. Kata-kata kunci: Sedimentasi, bangunan pengontrol sedimen, HEC-RAS, sabo dam, banjir.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信