使用有机交联聚合物密封胶在高渗透、低压砂岩地层中进行无钻机分层隔离:成功的现场应用

Baraa Al-Shammari, Nitin L. Rane, Sultan Hasan Al Harbi, S. Mohammad, Abdullah Al-Kinderi, Y. Santin, K. Matar
{"title":"使用有机交联聚合物密封胶在高渗透、低压砂岩地层中进行无钻机分层隔离:成功的现场应用","authors":"Baraa Al-Shammari, Nitin L. Rane, Sultan Hasan Al Harbi, S. Mohammad, Abdullah Al-Kinderi, Y. Santin, K. Matar","doi":"10.2118/192099-MS","DOIUrl":null,"url":null,"abstract":"\n This paper describes a rigless and cost-effective field implementation of conformance polymer sealant (CPS) and particulate-CPS (P-CPS) systems used successfully in high-permeability and low-pressure reservoirs for zonal isolation intervention.\n The CPS system is an organically crosslinked polymer that is thermally activated to effectively seal the targeted interval. The P-CPS system combines the CPS system with particulates that provide leakoff control to help ensure shallow matrix penetration of the sealant.\n The traditional method for zonal isolation consists of rig intervention for cement squeeze, which can be time-consuming and expensive. In high-permeability and low-pressure reservoirs, several unsuccessful attempts can extend the intervention by two or more weeks.\n CPS and P-CPS systems provide a predictable and controllable right-angle set time that can help to ensure sealing on the first attempt. These systems do not develop compressive strength, simplifying the cleanup stage by quickly and easily jetting it out of the wellbore with coiled tubing (CT), as opposed to cement that must be drilled/milled out.\n This paper describes laboratory evaluations, treatment design methodologies, and two case histories from Kuwait, including one well that produced 1,600 BOPD after reperforations.","PeriodicalId":11182,"journal":{"name":"Day 3 Thu, October 25, 2018","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Rigless Zonal Isolation in High-Permeability and Low-Pressure Sandstone Formations Using an Organically Crosslinked Polymer Sealant: Successful Field Application\",\"authors\":\"Baraa Al-Shammari, Nitin L. Rane, Sultan Hasan Al Harbi, S. Mohammad, Abdullah Al-Kinderi, Y. Santin, K. Matar\",\"doi\":\"10.2118/192099-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper describes a rigless and cost-effective field implementation of conformance polymer sealant (CPS) and particulate-CPS (P-CPS) systems used successfully in high-permeability and low-pressure reservoirs for zonal isolation intervention.\\n The CPS system is an organically crosslinked polymer that is thermally activated to effectively seal the targeted interval. The P-CPS system combines the CPS system with particulates that provide leakoff control to help ensure shallow matrix penetration of the sealant.\\n The traditional method for zonal isolation consists of rig intervention for cement squeeze, which can be time-consuming and expensive. In high-permeability and low-pressure reservoirs, several unsuccessful attempts can extend the intervention by two or more weeks.\\n CPS and P-CPS systems provide a predictable and controllable right-angle set time that can help to ensure sealing on the first attempt. These systems do not develop compressive strength, simplifying the cleanup stage by quickly and easily jetting it out of the wellbore with coiled tubing (CT), as opposed to cement that must be drilled/milled out.\\n This paper describes laboratory evaluations, treatment design methodologies, and two case histories from Kuwait, including one well that produced 1,600 BOPD after reperforations.\",\"PeriodicalId\":11182,\"journal\":{\"name\":\"Day 3 Thu, October 25, 2018\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 25, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/192099-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 25, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192099-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了一种无需钻机且经济高效的现场应用方法,即在高渗透、低压油藏中成功应用了一致性聚合物密封胶(CPS)和颗粒-CPS (P-CPS)系统进行层间隔离干预。CPS系统是一种有机交联聚合物,通过热活化可以有效密封目标层段。P-CPS系统将CPS系统与颗粒相结合,提供泄漏控制,有助于确保密封胶的浅基质渗透。传统的层间隔离方法包括钻机干预固井,这种方法既耗时又昂贵。在高渗透、低压油藏中,几次不成功的尝试可以将干预延长两周或更长时间。CPS和P-CPS系统提供了可预测和可控的直角坐封时间,有助于确保第一次尝试时的密封。这些系统不具有抗压强度,通过使用连续油管(CT)快速、轻松地将其喷射出井筒,简化了清理阶段,而不是必须钻/铣水泥。本文介绍了实验室评估、处理设计方法以及科威特的两个案例,其中包括一口井在再射孔后的日产量为1600桶。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Rigless Zonal Isolation in High-Permeability and Low-Pressure Sandstone Formations Using an Organically Crosslinked Polymer Sealant: Successful Field Application
This paper describes a rigless and cost-effective field implementation of conformance polymer sealant (CPS) and particulate-CPS (P-CPS) systems used successfully in high-permeability and low-pressure reservoirs for zonal isolation intervention. The CPS system is an organically crosslinked polymer that is thermally activated to effectively seal the targeted interval. The P-CPS system combines the CPS system with particulates that provide leakoff control to help ensure shallow matrix penetration of the sealant. The traditional method for zonal isolation consists of rig intervention for cement squeeze, which can be time-consuming and expensive. In high-permeability and low-pressure reservoirs, several unsuccessful attempts can extend the intervention by two or more weeks. CPS and P-CPS systems provide a predictable and controllable right-angle set time that can help to ensure sealing on the first attempt. These systems do not develop compressive strength, simplifying the cleanup stage by quickly and easily jetting it out of the wellbore with coiled tubing (CT), as opposed to cement that must be drilled/milled out. This paper describes laboratory evaluations, treatment design methodologies, and two case histories from Kuwait, including one well that produced 1,600 BOPD after reperforations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信