{"title":"斯特拉斯堡MP 10报道","authors":"J.C. Oberlin, M. Letournel, G. Heng","doi":"10.1016/0029-554X(81)90849-1","DOIUrl":null,"url":null,"abstract":"<div><p>Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 61-66"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90849-1","citationCount":"3","resultStr":"{\"title\":\"Strasbourg MP 10-report\",\"authors\":\"J.C. Oberlin, M. Letournel, G. Heng\",\"doi\":\"10.1016/0029-554X(81)90849-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.</p></div>\",\"PeriodicalId\":100971,\"journal\":{\"name\":\"Nuclear Instruments and Methods\",\"volume\":\"184 1\",\"pages\":\"Pages 61-66\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1981-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0029-554X(81)90849-1\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Instruments and Methods\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0029554X81908491\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908491","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.