斯特拉斯堡MP 10报道

J.C. Oberlin, M. Letournel, G. Heng
{"title":"斯特拉斯堡MP 10报道","authors":"J.C. Oberlin,&nbsp;M. Letournel,&nbsp;G. Heng","doi":"10.1016/0029-554X(81)90849-1","DOIUrl":null,"url":null,"abstract":"<div><p>Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 61-66"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90849-1","citationCount":"3","resultStr":"{\"title\":\"Strasbourg MP 10-report\",\"authors\":\"J.C. Oberlin,&nbsp;M. Letournel,&nbsp;G. Heng\",\"doi\":\"10.1016/0029-554X(81)90849-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.</p></div>\",\"PeriodicalId\":100971,\"journal\":{\"name\":\"Nuclear Instruments and Methods\",\"volume\":\"184 1\",\"pages\":\"Pages 61-66\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1981-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0029-554X(81)90849-1\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Instruments and Methods\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0029554X81908491\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908491","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

自Ebeltoft会议以来,MP-10在第一年以高达13 MV的正常运行规格运行,主要用于研究。该带仍然是标准的HVEC带,但安装在半开放式结构。累计9000多小时。从1979年8月开始,时间主要用于我们的升级项目和与此相关的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strasbourg MP 10-report

Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信