{"title":"利用三维激光扫描技术监测大跨度拱桥发射","authors":"Min Chao, Hao-Jan Chiu, C. Lu, C. Jeng","doi":"10.1680/JBREN.18.00036","DOIUrl":null,"url":null,"abstract":"A 140 m span arch bridge was launched across a watercourse in Taiwan using a special hydraulic crawler system. Temporary structural and geotechnical facilities included four launching tracks and th...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"25 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2019-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Using three-dimensional laser scanning for monitoring a long-span arch bridge launch\",\"authors\":\"Min Chao, Hao-Jan Chiu, C. Lu, C. Jeng\",\"doi\":\"10.1680/JBREN.18.00036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 140 m span arch bridge was launched across a watercourse in Taiwan using a special hydraulic crawler system. Temporary structural and geotechnical facilities included four launching tracks and th...\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2019-08-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JBREN.18.00036\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JBREN.18.00036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Using three-dimensional laser scanning for monitoring a long-span arch bridge launch
A 140 m span arch bridge was launched across a watercourse in Taiwan using a special hydraulic crawler system. Temporary structural and geotechnical facilities included four launching tracks and th...