{"title":"清单调度:单独、有远见、有前瞻","authors":"S. Beaty","doi":"10.1109/MPCS.1994.367017","DOIUrl":null,"url":null,"abstract":"List scheduling is a popular method of scheduling. It has the benefits of being a relatively fast technique and producing good results. It has weaknesses when dealing with restricted timing. Two ancillary methods, foresight and lookahead, have been developed to help mitigate this weakness. This paper compares the effectiveness of list scheduling alone, with foresight, and with lookahead. It also shows the benefits of lookahead are accrued with no time overhead.<<ETX>>","PeriodicalId":64175,"journal":{"name":"专用汽车","volume":"88 1","pages":"343-347"},"PeriodicalIF":0.0000,"publicationDate":"1994-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"List scheduling: alone, with foresight, and with lookahead\",\"authors\":\"S. Beaty\",\"doi\":\"10.1109/MPCS.1994.367017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"List scheduling is a popular method of scheduling. It has the benefits of being a relatively fast technique and producing good results. It has weaknesses when dealing with restricted timing. Two ancillary methods, foresight and lookahead, have been developed to help mitigate this weakness. This paper compares the effectiveness of list scheduling alone, with foresight, and with lookahead. It also shows the benefits of lookahead are accrued with no time overhead.<<ETX>>\",\"PeriodicalId\":64175,\"journal\":{\"name\":\"专用汽车\",\"volume\":\"88 1\",\"pages\":\"343-347\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-05-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"专用汽车\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1109/MPCS.1994.367017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"专用汽车","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/MPCS.1994.367017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
List scheduling: alone, with foresight, and with lookahead
List scheduling is a popular method of scheduling. It has the benefits of being a relatively fast technique and producing good results. It has weaknesses when dealing with restricted timing. Two ancillary methods, foresight and lookahead, have been developed to help mitigate this weakness. This paper compares the effectiveness of list scheduling alone, with foresight, and with lookahead. It also shows the benefits of lookahead are accrued with no time overhead.<>