{"title":"波兰输电系统电压稳定性评估","authors":"R. Lis","doi":"10.3384/ecp17142142","DOIUrl":null,"url":null,"abstract":"PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.","PeriodicalId":56990,"journal":{"name":"建模与仿真(英文)","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Voltage Stability Assessment of the Polish Power Transmission System\",\"authors\":\"R. Lis\",\"doi\":\"10.3384/ecp17142142\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.\",\"PeriodicalId\":56990,\"journal\":{\"name\":\"建模与仿真(英文)\",\"volume\":\"23 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"建模与仿真(英文)\",\"FirstCategoryId\":\"1093\",\"ListUrlMain\":\"https://doi.org/10.3384/ecp17142142\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"建模与仿真(英文)","FirstCategoryId":"1093","ListUrlMain":"https://doi.org/10.3384/ecp17142142","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PSE S.A.是波兰唯一的输电系统运营商,因此,负责提供无功功率资源,以将电压维持在预定义的限制范围内。本文介绍了输电网电压稳定性研究中存在的问题。电压问题是输电线路和变压器负荷过重的结果。电压不稳定是2006年6月26日波兰输电系统部分电压损坏的原因。用于电压安全评估的电压标准应要求,事故后N-1和有时N-2的最差母线电压,对于发电机母线必须大约大于0.95 p.u.,对于其他母线必须大于0.9 p.u.。在规划阶段,有功功率转移裕度可用作电压崩溃的接近度量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Voltage Stability Assessment of the Polish Power Transmission System
PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
61
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信