{"title":"波兰输电系统电压稳定性评估","authors":"R. Lis","doi":"10.3384/ecp17142142","DOIUrl":null,"url":null,"abstract":"PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.","PeriodicalId":56990,"journal":{"name":"建模与仿真(英文)","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Voltage Stability Assessment of the Polish Power Transmission System\",\"authors\":\"R. Lis\",\"doi\":\"10.3384/ecp17142142\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.\",\"PeriodicalId\":56990,\"journal\":{\"name\":\"建模与仿真(英文)\",\"volume\":\"23 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"建模与仿真(英文)\",\"FirstCategoryId\":\"1093\",\"ListUrlMain\":\"https://doi.org/10.3384/ecp17142142\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"建模与仿真(英文)","FirstCategoryId":"1093","ListUrlMain":"https://doi.org/10.3384/ecp17142142","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
PSE S.A.是波兰唯一的输电系统运营商,因此,负责提供无功功率资源,以将电压维持在预定义的限制范围内。本文介绍了输电网电压稳定性研究中存在的问题。电压问题是输电线路和变压器负荷过重的结果。电压不稳定是2006年6月26日波兰输电系统部分电压损坏的原因。用于电压安全评估的电压标准应要求,事故后N-1和有时N-2的最差母线电压,对于发电机母线必须大约大于0.95 p.u.,对于其他母线必须大于0.9 p.u.。在规划阶段,有功功率转移裕度可用作电压崩溃的接近度量。
Voltage Stability Assessment of the Polish Power Transmission System
PSE S.A. is the sole Transmission System Operator in Poland and, as such, responsible for the provision of reactive power resources for maintaining the voltage within predefined limits. This paper describes the problems associated with the investigation of voltage stability of transmission power grid. Voltage problems are the result of heavy loading of transmission lines and transformers. Voltage instability has been responsible for voltage damage in some parts of Polish Power Transmission System (PPTS) on 26 June 2006. The voltage criteria used for voltage security assessment should require, that the worst bus voltage at post-contingency N-1 and sometimes N-2, must be approximately greater than 0.95 p.u. for generator buses and 0.9 p.u. for others. At the stage of planning, the active power transfer margin may be used as a proximity measure of voltage collapse.