{"title":"天然气输气管线水合物堵塞的修复——西非深水案例","authors":"F. Papot, Celma Alexandre, M. Abdulssalam, Ambrosio Chita, A. Pina, Antonio Chipoque, P. Glénat","doi":"10.4043/29946-ms","DOIUrl":null,"url":null,"abstract":"\n This paper describes a recent hydrate plug issue experienced in a 12inch gas export line of one of TOTAL E&P operated FPSOs in the deep water of West Africa. In summer 2018, due to long-term maintenance work on the dehydration unit of the FPSO's gas compression, the off- spec produced gas was injected into a remote subsea gas well injector to avoid gas flaring, in line with TOTAL's flaring policy. Methanol was continuously injected for hydrate inhibition. Unfortunately, at the end of the operation, a hydrate plug occurred in the 12-inch gas export line. Through a multi–disciplinary crisis management team, all necessary efforts and procedures were implemented to remove the plug from the line in less than 1 week. The main steps included topsides depressurisation, a subsea intervention, additional hydrate inhibitor injection (Methanol and especially MEG) and liquid flushing operations.","PeriodicalId":10927,"journal":{"name":"Day 3 Thu, October 31, 2019","volume":"27 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Remediation of Hydrate Plug in Gas Export Line – A West Africa Deep Water Case\",\"authors\":\"F. Papot, Celma Alexandre, M. Abdulssalam, Ambrosio Chita, A. Pina, Antonio Chipoque, P. Glénat\",\"doi\":\"10.4043/29946-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper describes a recent hydrate plug issue experienced in a 12inch gas export line of one of TOTAL E&P operated FPSOs in the deep water of West Africa. In summer 2018, due to long-term maintenance work on the dehydration unit of the FPSO's gas compression, the off- spec produced gas was injected into a remote subsea gas well injector to avoid gas flaring, in line with TOTAL's flaring policy. Methanol was continuously injected for hydrate inhibition. Unfortunately, at the end of the operation, a hydrate plug occurred in the 12-inch gas export line. Through a multi–disciplinary crisis management team, all necessary efforts and procedures were implemented to remove the plug from the line in less than 1 week. The main steps included topsides depressurisation, a subsea intervention, additional hydrate inhibitor injection (Methanol and especially MEG) and liquid flushing operations.\",\"PeriodicalId\":10927,\"journal\":{\"name\":\"Day 3 Thu, October 31, 2019\",\"volume\":\"27 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 31, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29946-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 31, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29946-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Remediation of Hydrate Plug in Gas Export Line – A West Africa Deep Water Case
This paper describes a recent hydrate plug issue experienced in a 12inch gas export line of one of TOTAL E&P operated FPSOs in the deep water of West Africa. In summer 2018, due to long-term maintenance work on the dehydration unit of the FPSO's gas compression, the off- spec produced gas was injected into a remote subsea gas well injector to avoid gas flaring, in line with TOTAL's flaring policy. Methanol was continuously injected for hydrate inhibition. Unfortunately, at the end of the operation, a hydrate plug occurred in the 12-inch gas export line. Through a multi–disciplinary crisis management team, all necessary efforts and procedures were implemented to remove the plug from the line in less than 1 week. The main steps included topsides depressurisation, a subsea intervention, additional hydrate inhibitor injection (Methanol and especially MEG) and liquid flushing operations.