{"title":"Griya Arjuna Kejuden住宅低压配电规划","authors":"Deni Wachyudin, Amy Fahmy Ardiansyah, M. Soleh, A. Siswanto","doi":"10.47685/mestro.v5i01.377","DOIUrl":null,"url":null,"abstract":"In a low-voltage power distribution system, there are often disturbances that result in disruption of electricity distribution to customers, resulting in losses for customers and PLN. The problem that often occurs is the occurrence of voltage drops and power losses so that in planning the construction of a low-voltage electric power distribution network, it is necessary to anticipate the occurrence of these problems. This research is expected to be used as a lesson for the creation of a low-voltage electric power distribution network with suitable and environmentally friendly construction and with low investment costs. collected data by visiting the location to conduct a survey and obtain accurate data related to the state of the research location. The stages in planning the Low Voltage Electricity Distribution Network begin with a field survey to obtain the required data. The installed power for each unit is 1.300 VA, so the total installed power is 122,200 VA and the spare power is 5% of the installed power so that the total installed power is 128.310 VA. during peak load times it is estimated that power consumption will only absorb 80% or 97,760VA. The required substation is a Portal Type Pole with a transformator capacity is 160kVA. The total breakdown of the electricity distribution network budget at the Griya Arjuna Kejuden is IDR 382,333,141.","PeriodicalId":31717,"journal":{"name":"Simetris Jurnal Teknik Mesin Elektro dan Ilmu Komputer","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Planning of Low Voltage Electricity Distribution at Griya Arjuna Kejuden Housing\",\"authors\":\"Deni Wachyudin, Amy Fahmy Ardiansyah, M. Soleh, A. Siswanto\",\"doi\":\"10.47685/mestro.v5i01.377\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a low-voltage power distribution system, there are often disturbances that result in disruption of electricity distribution to customers, resulting in losses for customers and PLN. The problem that often occurs is the occurrence of voltage drops and power losses so that in planning the construction of a low-voltage electric power distribution network, it is necessary to anticipate the occurrence of these problems. This research is expected to be used as a lesson for the creation of a low-voltage electric power distribution network with suitable and environmentally friendly construction and with low investment costs. collected data by visiting the location to conduct a survey and obtain accurate data related to the state of the research location. The stages in planning the Low Voltage Electricity Distribution Network begin with a field survey to obtain the required data. The installed power for each unit is 1.300 VA, so the total installed power is 122,200 VA and the spare power is 5% of the installed power so that the total installed power is 128.310 VA. during peak load times it is estimated that power consumption will only absorb 80% or 97,760VA. The required substation is a Portal Type Pole with a transformator capacity is 160kVA. The total breakdown of the electricity distribution network budget at the Griya Arjuna Kejuden is IDR 382,333,141.\",\"PeriodicalId\":31717,\"journal\":{\"name\":\"Simetris Jurnal Teknik Mesin Elektro dan Ilmu Komputer\",\"volume\":\"23 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Simetris Jurnal Teknik Mesin Elektro dan Ilmu Komputer\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47685/mestro.v5i01.377\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Simetris Jurnal Teknik Mesin Elektro dan Ilmu Komputer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47685/mestro.v5i01.377","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在低压配电系统中,经常会出现干扰,导致用户配电中断,给用户和PLN造成损失。经常发生的问题是电压下降和功率损耗的发生,因此在规划低压配电网的建设时,有必要对这些问题的发生进行预测。预计该研究将为建设合适的、环保的、低投资成本的低压配电网提供借鉴。通过访问该地点进行调查收集数据,获得与研究地点状态相关的准确数据。规划低压配电网的各个阶段都是从实地调查开始的,以获得所需的数据。每台机组装机功率为1.300 VA,总装机功率为122200 VA,备用功率为总装机功率的5%,总装机功率为128.310 VA。在用电高峰时段,预计耗电量仅吸收80%,即97760 VA。所需变电站为门式电线杆,变压器容量160kVA。Griya Arjuna Kejuden的配电网络预算总额为382,333,141印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Planning of Low Voltage Electricity Distribution at Griya Arjuna Kejuden Housing
In a low-voltage power distribution system, there are often disturbances that result in disruption of electricity distribution to customers, resulting in losses for customers and PLN. The problem that often occurs is the occurrence of voltage drops and power losses so that in planning the construction of a low-voltage electric power distribution network, it is necessary to anticipate the occurrence of these problems. This research is expected to be used as a lesson for the creation of a low-voltage electric power distribution network with suitable and environmentally friendly construction and with low investment costs. collected data by visiting the location to conduct a survey and obtain accurate data related to the state of the research location. The stages in planning the Low Voltage Electricity Distribution Network begin with a field survey to obtain the required data. The installed power for each unit is 1.300 VA, so the total installed power is 122,200 VA and the spare power is 5% of the installed power so that the total installed power is 128.310 VA. during peak load times it is estimated that power consumption will only absorb 80% or 97,760VA. The required substation is a Portal Type Pole with a transformator capacity is 160kVA. The total breakdown of the electricity distribution network budget at the Griya Arjuna Kejuden is IDR 382,333,141.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信