P. Hofer, C. Strauß, J. Eder, Lukas Hager, Robert Wenighofer, Michael Nöger, S. Fuchs
{"title":"快速隧道建模工具<e:1> /快速隧道建模工具用于地下结构","authors":"P. Hofer, C. Strauß, J. Eder, Lukas Hager, Robert Wenighofer, Michael Nöger, S. Fuchs","doi":"10.14627/537707003","DOIUrl":null,"url":null,"abstract":"The success of managing complex underground operations depends to a large extent on preparation for this very special operational environment. In this context, virtual entry into the underground structure before the start of the operation is crucial. The Fast Tunnel Modelling Tool supports visualization where digital data is not available. The integration of further Tunnel Information Modelling data and ventilation simulation enriches this visualization and increases its value.","PeriodicalId":36308,"journal":{"name":"AGIT- Journal fur Angewandte Geoinformatik","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Das Fast Tunnel Modelling Tool für Untertagebauwerke / Fast Tunnel Modelling Tool for Subsurface Structures\",\"authors\":\"P. Hofer, C. Strauß, J. Eder, Lukas Hager, Robert Wenighofer, Michael Nöger, S. Fuchs\",\"doi\":\"10.14627/537707003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The success of managing complex underground operations depends to a large extent on preparation for this very special operational environment. In this context, virtual entry into the underground structure before the start of the operation is crucial. The Fast Tunnel Modelling Tool supports visualization where digital data is not available. The integration of further Tunnel Information Modelling data and ventilation simulation enriches this visualization and increases its value.\",\"PeriodicalId\":36308,\"journal\":{\"name\":\"AGIT- Journal fur Angewandte Geoinformatik\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AGIT- Journal fur Angewandte Geoinformatik\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14627/537707003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AGIT- Journal fur Angewandte Geoinformatik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14627/537707003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Das Fast Tunnel Modelling Tool für Untertagebauwerke / Fast Tunnel Modelling Tool for Subsurface Structures
The success of managing complex underground operations depends to a large extent on preparation for this very special operational environment. In this context, virtual entry into the underground structure before the start of the operation is crucial. The Fast Tunnel Modelling Tool supports visualization where digital data is not available. The integration of further Tunnel Information Modelling data and ventilation simulation enriches this visualization and increases its value.