最大化平台价值:增加弗吉尼亚级部署

IF 0.2 4区 工程技术 Q4 ENGINEERING, CIVIL
CHRISTY I. GOFF, CHARLES L. McNAMARA, JOSEPH M. BRADLEY, CHRISTOPHER S. TROST, WILLIAM J. DALTON, MICHAEL E. JABALEY, JR.
{"title":"最大化平台价值:增加弗吉尼亚级部署","authors":"CHRISTY I. GOFF,&nbsp;CHARLES L. McNAMARA,&nbsp;JOSEPH M. BRADLEY,&nbsp;CHRISTOPHER S. TROST,&nbsp;WILLIAM J. DALTON,&nbsp;MICHAEL E. JABALEY, JR.","doi":"10.1111/j.1559-3584.2011.00335.x","DOIUrl":null,"url":null,"abstract":"<p>The FY11 Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels (commonly known as the 30-Year Shipbuilding Plan) forecasts that the Navy's Attack Submarine (SSN) force structure will fall below the requirement of 48 SSNs in 2024, and will remain below the requirement throughout at least 2040 (the limit of the current report). Operating the fleet with fewer ships than necessary to meet commitments around the globe makes it imperative to maximize the mission time provided by each platform. Accordingly, the VIRGINIA Class Submarine Program Office (PMS 450) has developed a plan to mitigate this shortfall in force structure by designing reductions in depot-level maintenance, thereby improving operational availability and maximizing mission time. This plan is encompassed in the Program Office's Reduction of Total Ownership Cost (RTOC) goals. However, actions arising from pressure to reduce Total Ownership Cost (TOC) may have the potential to inadvertently limit available platform mission time if the full consequences, including indirect impacts, are not rigorously assessed and analyzed in advance. The VIRGINIA Class Submarine Program faced this challenge explicitly in implementing the RTOC program while simultaneously working through details of a class maintenance plan modification for later submarines that adds a deployment to the operating cycle. Reducing TOC, while making changes to both the maintenance plan and the platform design, requires an integrated analytic capability to assess the impact of potential changes to both cost and delivered mission time. Evaluating the impact of maintenance changes on mission time is complicated by interactions between multiple stakeholders involved in controlling and managing the lifecycle of the submarine—including those responsible for maintenance planning (and the ability of the maintenance facilities to execute the work), operations and training, and modernizations. An approach and analytic framework, which captures “TOC Effectiveness” (defined as Mission Time Delivered divided by Net Cost) is needed to balance divergent program and stakeholder goals. To capture TOC effectiveness, a time-phased dynamic simulation of the lifecycle employment of VIRGINIA Class Submarines (including depot maintenance time) has been developed to determine the likely submarine employment consequences of the plans, policies, and constraints of the stakeholders involved, and to ensure that the lifecycle maintenance plan targets are achieved. The simulation was validated against historical performance of LOS ANGELES Class maintenance execution at public shipyards, explicitly adjusting for known differences in VIRGINIA Class work packages (the first VIRGINIA Class depot maintenance availability did not start until October 2010). Simulation analysis has identified likely results of alternative plans and/or policies and provided insight into where changes can be made across multiple stakeholders to efficiently and effectively achieve program goals for deployments. The simulation is integrated into the VIRGINIA Class RTOC program process to identify specific areas where changes have high leverage to increase mission time, evaluate specific changes proposed by the RTOC effort, and track progress toward achieving mission time goals.</p>","PeriodicalId":49775,"journal":{"name":"Naval Engineers Journal","volume":"123 3","pages":"119-139"},"PeriodicalIF":0.2000,"publicationDate":"2012-01-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1111/j.1559-3584.2011.00335.x","citationCount":"3","resultStr":"{\"title\":\"Maximizing Platform Value: Increasing VIRGINIA Class Deployments\",\"authors\":\"CHRISTY I. GOFF,&nbsp;CHARLES L. McNAMARA,&nbsp;JOSEPH M. BRADLEY,&nbsp;CHRISTOPHER S. TROST,&nbsp;WILLIAM J. DALTON,&nbsp;MICHAEL E. JABALEY, JR.\",\"doi\":\"10.1111/j.1559-3584.2011.00335.x\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The FY11 Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels (commonly known as the 30-Year Shipbuilding Plan) forecasts that the Navy's Attack Submarine (SSN) force structure will fall below the requirement of 48 SSNs in 2024, and will remain below the requirement throughout at least 2040 (the limit of the current report). Operating the fleet with fewer ships than necessary to meet commitments around the globe makes it imperative to maximize the mission time provided by each platform. Accordingly, the VIRGINIA Class Submarine Program Office (PMS 450) has developed a plan to mitigate this shortfall in force structure by designing reductions in depot-level maintenance, thereby improving operational availability and maximizing mission time. This plan is encompassed in the Program Office's Reduction of Total Ownership Cost (RTOC) goals. However, actions arising from pressure to reduce Total Ownership Cost (TOC) may have the potential to inadvertently limit available platform mission time if the full consequences, including indirect impacts, are not rigorously assessed and analyzed in advance. The VIRGINIA Class Submarine Program faced this challenge explicitly in implementing the RTOC program while simultaneously working through details of a class maintenance plan modification for later submarines that adds a deployment to the operating cycle. Reducing TOC, while making changes to both the maintenance plan and the platform design, requires an integrated analytic capability to assess the impact of potential changes to both cost and delivered mission time. Evaluating the impact of maintenance changes on mission time is complicated by interactions between multiple stakeholders involved in controlling and managing the lifecycle of the submarine—including those responsible for maintenance planning (and the ability of the maintenance facilities to execute the work), operations and training, and modernizations. An approach and analytic framework, which captures “TOC Effectiveness” (defined as Mission Time Delivered divided by Net Cost) is needed to balance divergent program and stakeholder goals. To capture TOC effectiveness, a time-phased dynamic simulation of the lifecycle employment of VIRGINIA Class Submarines (including depot maintenance time) has been developed to determine the likely submarine employment consequences of the plans, policies, and constraints of the stakeholders involved, and to ensure that the lifecycle maintenance plan targets are achieved. The simulation was validated against historical performance of LOS ANGELES Class maintenance execution at public shipyards, explicitly adjusting for known differences in VIRGINIA Class work packages (the first VIRGINIA Class depot maintenance availability did not start until October 2010). Simulation analysis has identified likely results of alternative plans and/or policies and provided insight into where changes can be made across multiple stakeholders to efficiently and effectively achieve program goals for deployments. The simulation is integrated into the VIRGINIA Class RTOC program process to identify specific areas where changes have high leverage to increase mission time, evaluate specific changes proposed by the RTOC effort, and track progress toward achieving mission time goals.</p>\",\"PeriodicalId\":49775,\"journal\":{\"name\":\"Naval Engineers Journal\",\"volume\":\"123 3\",\"pages\":\"119-139\"},\"PeriodicalIF\":0.2000,\"publicationDate\":\"2012-01-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1111/j.1559-3584.2011.00335.x\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Engineers Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1111/j.1559-3584.2011.00335.x\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Engineers Journal","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1111/j.1559-3584.2011.00335.x","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

摘要

提交给国会的《2011财年海军舰艇建造年度远程计划报告》(通常称为《30年造船计划》)预测,2024年,海军的攻击潜艇(SSN)部队结构将低于48艘SSN的要求,并将至少在2040年(当前报告的限值)保持低于要求。船队的运营船只数量少于履行全球承诺所需的数量,因此必须最大限度地延长每个平台提供的任务时间。因此,弗吉尼亚级潜艇项目办公室(PMS 450)制定了一项计划,通过设计减少基地级维修来缓解部队结构的短缺,从而提高作战可用性并最大限度地延长任务时间。该计划包含在项目办公室的降低总拥有成本(RTOC)目标中。然而,如果事先没有严格评估和分析包括间接影响在内的全部后果,那么由于降低总拥有成本(TOC)的压力而产生的行动可能会无意中限制可用的平台任务时间。弗吉尼亚级潜艇项目在实施RTOC项目时明确面临这一挑战,同时为后期潜艇修改级维修计划的细节,为运行周期增加部署。减少TOC,同时对维护计划和平台设计进行更改,需要综合分析能力来评估潜在更改对成本和交付任务时间的影响。参与控制和管理潜艇生命周期的多个利益相关者之间的互动使评估维护变化对任务时间的影响变得复杂,包括负责维护规划(以及维护设施执行工作的能力)、操作和培训以及现代化的利益相关者。需要一种方法和分析框架,捕捉“TOC有效性”(定义为交付任务时间除以净成本),以平衡不同的计划和利益相关者目标。为了获取TOC的有效性,已经开发了弗吉尼亚级潜艇生命周期使用(包括基地维护时间)的分阶段动态模拟,以确定相关利益相关者的计划、政策和约束可能对潜艇使用产生的影响,并确保实现生命周期维护计划目标。该模拟根据公共造船厂洛杉矶级维修执行的历史性能进行了验证,明确调整了弗吉尼亚级工作包中的已知差异(第一个弗吉尼亚级仓库维修可用性直到2010年10月才开始)。模拟分析已经确定了替代计划和/或政策的可能结果,并深入了解了在多个利益相关者之间可以进行哪些更改,以高效、有效地实现部署的计划目标。该模拟集成到弗吉尼亚级RTOC程序流程中,以确定变更对增加任务时间具有高度影响力的特定领域,评估RTOC工作提出的具体变更,并跟踪实现任务时间目标的进展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maximizing Platform Value: Increasing VIRGINIA Class Deployments

The FY11 Report to Congress on Annual Long-Range Plan for Construction of Naval Vessels (commonly known as the 30-Year Shipbuilding Plan) forecasts that the Navy's Attack Submarine (SSN) force structure will fall below the requirement of 48 SSNs in 2024, and will remain below the requirement throughout at least 2040 (the limit of the current report). Operating the fleet with fewer ships than necessary to meet commitments around the globe makes it imperative to maximize the mission time provided by each platform. Accordingly, the VIRGINIA Class Submarine Program Office (PMS 450) has developed a plan to mitigate this shortfall in force structure by designing reductions in depot-level maintenance, thereby improving operational availability and maximizing mission time. This plan is encompassed in the Program Office's Reduction of Total Ownership Cost (RTOC) goals. However, actions arising from pressure to reduce Total Ownership Cost (TOC) may have the potential to inadvertently limit available platform mission time if the full consequences, including indirect impacts, are not rigorously assessed and analyzed in advance. The VIRGINIA Class Submarine Program faced this challenge explicitly in implementing the RTOC program while simultaneously working through details of a class maintenance plan modification for later submarines that adds a deployment to the operating cycle. Reducing TOC, while making changes to both the maintenance plan and the platform design, requires an integrated analytic capability to assess the impact of potential changes to both cost and delivered mission time. Evaluating the impact of maintenance changes on mission time is complicated by interactions between multiple stakeholders involved in controlling and managing the lifecycle of the submarine—including those responsible for maintenance planning (and the ability of the maintenance facilities to execute the work), operations and training, and modernizations. An approach and analytic framework, which captures “TOC Effectiveness” (defined as Mission Time Delivered divided by Net Cost) is needed to balance divergent program and stakeholder goals. To capture TOC effectiveness, a time-phased dynamic simulation of the lifecycle employment of VIRGINIA Class Submarines (including depot maintenance time) has been developed to determine the likely submarine employment consequences of the plans, policies, and constraints of the stakeholders involved, and to ensure that the lifecycle maintenance plan targets are achieved. The simulation was validated against historical performance of LOS ANGELES Class maintenance execution at public shipyards, explicitly adjusting for known differences in VIRGINIA Class work packages (the first VIRGINIA Class depot maintenance availability did not start until October 2010). Simulation analysis has identified likely results of alternative plans and/or policies and provided insight into where changes can be made across multiple stakeholders to efficiently and effectively achieve program goals for deployments. The simulation is integrated into the VIRGINIA Class RTOC program process to identify specific areas where changes have high leverage to increase mission time, evaluate specific changes proposed by the RTOC effort, and track progress toward achieving mission time goals.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Naval Engineers Journal
Naval Engineers Journal 工程技术-工程:海洋
自引率
0.00%
发文量
0
审稿时长
>12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信