重塑建筑供应链:

Ekambaram Palaneeswaran, Mohan M. Kumaraswamy, Xue Qing Zhang
{"title":"重塑建筑供应链:","authors":"Ekambaram Palaneeswaran,&nbsp;Mohan M. Kumaraswamy,&nbsp;Xue Qing Zhang","doi":"10.1016/S0969-7012(00)00025-3","DOIUrl":null,"url":null,"abstract":"<div><p>Establishing synergistic supply chains in general and optimizing source selection in particular play a significant role in the overall success of any construction project. The generic objective of the source selection process is to identify a ‘capable’ source from among those ‘competent’ and ‘credible’ applicants whose performance can be expected to best meet the clients’ requirements at an affordable and optimal cost. This paper examines relevant selection processes along different construction supply chain routes such as ‘design-bid-build’, ‘design-build’, ‘design-build-maintain’, ‘design-build-operate’ and ‘build-operate-transfer’. A cross-section of different source selection practices by various clients is also provided for benchmarking and improving current practices, for example, towards enhanced value across each link of the supply chain.</p></div>","PeriodicalId":100504,"journal":{"name":"European Journal of Purchasing & Supply Management","volume":"7 3","pages":"Pages 165-178"},"PeriodicalIF":0.0000,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S0969-7012(00)00025-3","citationCount":"41","resultStr":"{\"title\":\"Reforging construction supply chains:\",\"authors\":\"Ekambaram Palaneeswaran,&nbsp;Mohan M. Kumaraswamy,&nbsp;Xue Qing Zhang\",\"doi\":\"10.1016/S0969-7012(00)00025-3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Establishing synergistic supply chains in general and optimizing source selection in particular play a significant role in the overall success of any construction project. The generic objective of the source selection process is to identify a ‘capable’ source from among those ‘competent’ and ‘credible’ applicants whose performance can be expected to best meet the clients’ requirements at an affordable and optimal cost. This paper examines relevant selection processes along different construction supply chain routes such as ‘design-bid-build’, ‘design-build’, ‘design-build-maintain’, ‘design-build-operate’ and ‘build-operate-transfer’. A cross-section of different source selection practices by various clients is also provided for benchmarking and improving current practices, for example, towards enhanced value across each link of the supply chain.</p></div>\",\"PeriodicalId\":100504,\"journal\":{\"name\":\"European Journal of Purchasing & Supply Management\",\"volume\":\"7 3\",\"pages\":\"Pages 165-178\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S0969-7012(00)00025-3\",\"citationCount\":\"41\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Purchasing & Supply Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0969701200000253\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Purchasing & Supply Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0969701200000253","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 41

摘要

总体上建立协同供应链,特别是优化来源选择,对任何建设项目的整体成功都起着重要作用。来源选择过程的总体目标是从“有能力”和“可信”的申请人中确定一个“有能力的”来源,这些申请人的表现有望以可承受的最佳成本最符合客户的要求。本文考察了不同建筑供应链路线上的相关选择过程,如“设计-投标-建造”、“设计-建造”,“设计-制造-维护”、“建造-建造-运营”和“建造-运营-转让”。还提供了不同客户的不同来源选择实践的横截面,用于基准测试和改进当前实践,例如,提高供应链每个环节的价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reforging construction supply chains:

Establishing synergistic supply chains in general and optimizing source selection in particular play a significant role in the overall success of any construction project. The generic objective of the source selection process is to identify a ‘capable’ source from among those ‘competent’ and ‘credible’ applicants whose performance can be expected to best meet the clients’ requirements at an affordable and optimal cost. This paper examines relevant selection processes along different construction supply chain routes such as ‘design-bid-build’, ‘design-build’, ‘design-build-maintain’, ‘design-build-operate’ and ‘build-operate-transfer’. A cross-section of different source selection practices by various clients is also provided for benchmarking and improving current practices, for example, towards enhanced value across each link of the supply chain.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信