项目管理领域的项目优先排序方法分析

Tehnika Pub Date : 2023-01-01 DOI:10.5937/tehnika2304475p
Katarina Petrović
{"title":"项目管理领域的项目优先排序方法分析","authors":"Katarina Petrović","doi":"10.5937/tehnika2304475p","DOIUrl":null,"url":null,"abstract":"Project prioritization is a major challenge which many companies from different inudustries are facing. There is a large number of methods that can be used for this purpose, however, it has been shown that DEA and AHP methods are some of the most prevalent in practice. Based on that, this paper shows conudcted analysis of application of those methods on one side, in field of program management and on the other side, in tearms of other fields. The main goal of this paper is to determine the advantages and disadvantages of DEA and AHP methods from the perspective of program management, based on the analysis of selected research and papers about application in various fields. In addition, the methodological aspect of the application of both methods has been covered.","PeriodicalId":22484,"journal":{"name":"Tehnika","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of methods for project prioritization in field of program management\",\"authors\":\"Katarina Petrović\",\"doi\":\"10.5937/tehnika2304475p\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project prioritization is a major challenge which many companies from different inudustries are facing. There is a large number of methods that can be used for this purpose, however, it has been shown that DEA and AHP methods are some of the most prevalent in practice. Based on that, this paper shows conudcted analysis of application of those methods on one side, in field of program management and on the other side, in tearms of other fields. The main goal of this paper is to determine the advantages and disadvantages of DEA and AHP methods from the perspective of program management, based on the analysis of selected research and papers about application in various fields. In addition, the methodological aspect of the application of both methods has been covered.\",\"PeriodicalId\":22484,\"journal\":{\"name\":\"Tehnika\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tehnika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/tehnika2304475p\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tehnika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/tehnika2304475p","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目优先排序是许多不同行业的公司面临的主要挑战。有大量的方法可用于此目的,然而,已经证明DEA和AHP方法是实践中最普遍的一些方法。在此基础上,本文一方面对这些方法在项目管理领域的应用,另一方面对这些方法在其他领域团队中的应用进行了分析。本文的主要目的是从项目管理的角度来确定DEA和AHP方法的优缺点,通过对各领域应用的研究和论文的分析。此外,还讨论了应用这两种方法的方法方面的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of methods for project prioritization in field of program management
Project prioritization is a major challenge which many companies from different inudustries are facing. There is a large number of methods that can be used for this purpose, however, it has been shown that DEA and AHP methods are some of the most prevalent in practice. Based on that, this paper shows conudcted analysis of application of those methods on one side, in field of program management and on the other side, in tearms of other fields. The main goal of this paper is to determine the advantages and disadvantages of DEA and AHP methods from the perspective of program management, based on the analysis of selected research and papers about application in various fields. In addition, the methodological aspect of the application of both methods has been covered.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
26
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信