{"title":"计算了斗轮挖掘机选择性开采覆盖层的能力","authors":"S. Ilić","doi":"10.5937/podrad2036019i","DOIUrl":null,"url":null,"abstract":"During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.","PeriodicalId":31689,"journal":{"name":"Podzemni Radovi","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation the capacity of bucket wheel excavator the selective mining of overburden\",\"authors\":\"S. Ilić\",\"doi\":\"10.5937/podrad2036019i\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.\",\"PeriodicalId\":31689,\"journal\":{\"name\":\"Podzemni Radovi\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Podzemni Radovi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/podrad2036019i\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Podzemni Radovi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/podrad2036019i","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Calculation the capacity of bucket wheel excavator the selective mining of overburden
During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.