伊朗南帕尔斯9期、10期、19期、20期和21期非工业建筑EPC项目延误原因调查和排序

IF 1.3 Q4 ENGINEERING, INDUSTRIAL
Mohammad Reza Motallebi Zadeh, Amir Qayoumi
{"title":"伊朗南帕尔斯9期、10期、19期、20期和21期非工业建筑EPC项目延误原因调查和排序","authors":"Mohammad Reza Motallebi Zadeh, Amir Qayoumi","doi":"10.5267/j.jpm.2022.8.003","DOIUrl":null,"url":null,"abstract":"Delay is one of the most common causes of construction projects failure in Iran. The larger sizes of the projects, the more risks and costs of delays. In this paper, the causes of delays in EPC contracts of nonindustrial buildings were excavated from the related previous research and several interviews with experts of this subject, and adjusted by the brainstorming technique, Delphi and reconciling the nature of these projects. Then, a questionnaire was distributed among 52 experts working in the South Pars project, and the data were analyzed by descriptive and factor analysis methods. Descriptive analysis revealed that “Inflation and escalation of material prices and human resources salaries”, “Unrealistic contract duration and requirements imposed” and “Political situation” were the most significant delay factors. Meanwhile, factor analysis indicates that “Improper construction methods”, “Shortage of experienced and skilled labor” and “Long acceptance process (shop drawings, permits, tests and samples)” were the most important causes of delay.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran\",\"authors\":\"Mohammad Reza Motallebi Zadeh, Amir Qayoumi\",\"doi\":\"10.5267/j.jpm.2022.8.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Delay is one of the most common causes of construction projects failure in Iran. The larger sizes of the projects, the more risks and costs of delays. In this paper, the causes of delays in EPC contracts of nonindustrial buildings were excavated from the related previous research and several interviews with experts of this subject, and adjusted by the brainstorming technique, Delphi and reconciling the nature of these projects. Then, a questionnaire was distributed among 52 experts working in the South Pars project, and the data were analyzed by descriptive and factor analysis methods. Descriptive analysis revealed that “Inflation and escalation of material prices and human resources salaries”, “Unrealistic contract duration and requirements imposed” and “Political situation” were the most significant delay factors. Meanwhile, factor analysis indicates that “Improper construction methods”, “Shortage of experienced and skilled labor” and “Long acceptance process (shop drawings, permits, tests and samples)” were the most important causes of delay.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2022.8.003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.8.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

拖延是伊朗建设项目失败的最常见原因之一。项目规模越大,延误的风险和成本就越大。本文从前人的相关研究和对该课题专家的多次访谈中挖掘出非工业建筑EPC合同延误的原因,并通过头脑风暴法、德尔菲法和协调这些项目的性质进行调整。然后,对参与South Pars项目的52名专家进行问卷调查,并采用描述性和因子分析法对数据进行分析。描述性分析显示,“通货膨胀和材料价格和人力资源薪金的上升”、“合同期限和规定的要求不切实际”和“政治局势”是最重要的拖延因素。同时,因素分析表明,“施工方法不当”、“缺乏经验和熟练的劳动力”和“验收过程长(施工图、许可证、测试和样品)”是延误的最重要原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran
Delay is one of the most common causes of construction projects failure in Iran. The larger sizes of the projects, the more risks and costs of delays. In this paper, the causes of delays in EPC contracts of nonindustrial buildings were excavated from the related previous research and several interviews with experts of this subject, and adjusted by the brainstorming technique, Delphi and reconciling the nature of these projects. Then, a questionnaire was distributed among 52 experts working in the South Pars project, and the data were analyzed by descriptive and factor analysis methods. Descriptive analysis revealed that “Inflation and escalation of material prices and human resources salaries”, “Unrealistic contract duration and requirements imposed” and “Political situation” were the most significant delay factors. Meanwhile, factor analysis indicates that “Improper construction methods”, “Shortage of experienced and skilled labor” and “Long acceptance process (shop drawings, permits, tests and samples)” were the most important causes of delay.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信