具有特定机器预防性维护的有序优先约束流水车间调度问题

IF 1.3 Q4 ENGINEERING, INDUSTRIAL
T. J. Kumar, M. Thangaraj
{"title":"具有特定机器预防性维护的有序优先约束流水车间调度问题","authors":"T. J. Kumar, M. Thangaraj","doi":"10.5267/j.jpm.2022.8.002","DOIUrl":null,"url":null,"abstract":"In reality, the machines may interrupt because of the nature of deterioration of the machines. Thus, it is inevitable to perform maintenance alongside production planning. The preventive maintenance is a schedule of strategic operations that are performed prior to the failure occurring, to retain the system operating at the preferred level of consistency. Thus, preventive maintenance plays a significant role in flow shop scheduling models. With its practical significance, this study addresses a practical three-machine n jobs flow shop-scheduling problem (FSSP) in which machine specific preventive maintenance, where each machine is given with a maintenance schedule is considered. In addition, a practical ordered precedence constraint in which some set of jobs has to process in the specified order irrespective of their processing times is also considered. The problem’s goal is to establish the optimal job sequence and preventive maintenance such that the overall cost of tardiness and preventive maintenance is as minimum as possible. An efficient heuristic approach is designed to tackle the present model, resulting in total cost savings. A comparative analysis is not conducted due to absence of studies on the current problem in the literature. However, Computational experiments are carried out on some test instances and results are reported. The reported results may be useful for future studies.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance\",\"authors\":\"T. J. Kumar, M. Thangaraj\",\"doi\":\"10.5267/j.jpm.2022.8.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In reality, the machines may interrupt because of the nature of deterioration of the machines. Thus, it is inevitable to perform maintenance alongside production planning. The preventive maintenance is a schedule of strategic operations that are performed prior to the failure occurring, to retain the system operating at the preferred level of consistency. Thus, preventive maintenance plays a significant role in flow shop scheduling models. With its practical significance, this study addresses a practical three-machine n jobs flow shop-scheduling problem (FSSP) in which machine specific preventive maintenance, where each machine is given with a maintenance schedule is considered. In addition, a practical ordered precedence constraint in which some set of jobs has to process in the specified order irrespective of their processing times is also considered. The problem’s goal is to establish the optimal job sequence and preventive maintenance such that the overall cost of tardiness and preventive maintenance is as minimum as possible. An efficient heuristic approach is designed to tackle the present model, resulting in total cost savings. A comparative analysis is not conducted due to absence of studies on the current problem in the literature. However, Computational experiments are carried out on some test instances and results are reported. The reported results may be useful for future studies.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2022.8.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.8.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

摘要

在现实中,由于机器劣化的性质,机器可能会中断。因此,在生产计划的同时进行维护是不可避免的。预防性维护是在故障发生之前执行的战略操作的时间表,以保持系统在首选的一致性水平上运行。因此,预防性维护在流水车间调度模型中起着重要的作用。本文研究了一个实际的三机器n作业流车间调度问题(FSSP),该问题考虑了机器特定的预防性维护,其中每台机器都有一个维护计划。此外,还考虑了实际的有序优先级约束,其中某些作业必须按指定的顺序处理,而不考虑其处理时间。该问题的目标是建立最优的作业顺序和预防性维护,以使延误和预防性维护的总成本尽可能低。设计了一种有效的启发式方法来处理当前模型,从而节省了总成本。由于文献中缺乏对当前问题的研究,没有进行比较分析。然而,在一些测试实例上进行了计算实验,并报告了结果。报告的结果可能对未来的研究有用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance
In reality, the machines may interrupt because of the nature of deterioration of the machines. Thus, it is inevitable to perform maintenance alongside production planning. The preventive maintenance is a schedule of strategic operations that are performed prior to the failure occurring, to retain the system operating at the preferred level of consistency. Thus, preventive maintenance plays a significant role in flow shop scheduling models. With its practical significance, this study addresses a practical three-machine n jobs flow shop-scheduling problem (FSSP) in which machine specific preventive maintenance, where each machine is given with a maintenance schedule is considered. In addition, a practical ordered precedence constraint in which some set of jobs has to process in the specified order irrespective of their processing times is also considered. The problem’s goal is to establish the optimal job sequence and preventive maintenance such that the overall cost of tardiness and preventive maintenance is as minimum as possible. An efficient heuristic approach is designed to tackle the present model, resulting in total cost savings. A comparative analysis is not conducted due to absence of studies on the current problem in the literature. However, Computational experiments are carried out on some test instances and results are reported. The reported results may be useful for future studies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信