{"title":"促进全面质量管理实施的信息系统设计框架","authors":"N. Ahmed, R. Ravichandran","doi":"10.4018/IRMJ.1999100101","DOIUrl":null,"url":null,"abstract":"This paper provides a framework for information systems IS design for TQM implementation. The framework consists of three main phases. In the first, TQM implementation tasks are established. These tasks include identifying customer satisfaction variables CSV, translation of CSV to firm response variables FRV, benchmarking, and continuous improvement. The second phase includes analyses of communication effectiveness requirements between the organizational entities such as sales/marketing, top management, operations, accounting/finance and also with the customers. In the third phase, appropriate IS component inventories for different communication interfaces are generated. This was accomplished by first mapping the TQM implementation tasks for the communication interfaces. Then appropriate IS/IT solution was recommended for each interface. The final IS design is achieved by integrating IS components at technological, functional, and strategic levels. Finally, a hypothetical example for a large manufacturing firm is provided.","PeriodicalId":44735,"journal":{"name":"Information Resources Management Journal","volume":"12 1","pages":"5-13"},"PeriodicalIF":1.1000,"publicationDate":"1999-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"An information systems design framework for facilitating TQM implementation\",\"authors\":\"N. Ahmed, R. Ravichandran\",\"doi\":\"10.4018/IRMJ.1999100101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper provides a framework for information systems IS design for TQM implementation. The framework consists of three main phases. In the first, TQM implementation tasks are established. These tasks include identifying customer satisfaction variables CSV, translation of CSV to firm response variables FRV, benchmarking, and continuous improvement. The second phase includes analyses of communication effectiveness requirements between the organizational entities such as sales/marketing, top management, operations, accounting/finance and also with the customers. In the third phase, appropriate IS component inventories for different communication interfaces are generated. This was accomplished by first mapping the TQM implementation tasks for the communication interfaces. Then appropriate IS/IT solution was recommended for each interface. The final IS design is achieved by integrating IS components at technological, functional, and strategic levels. Finally, a hypothetical example for a large manufacturing firm is provided.\",\"PeriodicalId\":44735,\"journal\":{\"name\":\"Information Resources Management Journal\",\"volume\":\"12 1\",\"pages\":\"5-13\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"1999-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Information Resources Management Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/IRMJ.1999100101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"INFORMATION SCIENCE & LIBRARY SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Information Resources Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/IRMJ.1999100101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"INFORMATION SCIENCE & LIBRARY SCIENCE","Score":null,"Total":0}
An information systems design framework for facilitating TQM implementation
This paper provides a framework for information systems IS design for TQM implementation. The framework consists of three main phases. In the first, TQM implementation tasks are established. These tasks include identifying customer satisfaction variables CSV, translation of CSV to firm response variables FRV, benchmarking, and continuous improvement. The second phase includes analyses of communication effectiveness requirements between the organizational entities such as sales/marketing, top management, operations, accounting/finance and also with the customers. In the third phase, appropriate IS component inventories for different communication interfaces are generated. This was accomplished by first mapping the TQM implementation tasks for the communication interfaces. Then appropriate IS/IT solution was recommended for each interface. The final IS design is achieved by integrating IS components at technological, functional, and strategic levels. Finally, a hypothetical example for a large manufacturing firm is provided.
期刊介绍:
Topics should be drawn from, but not limited to, the following areas, with major emphasis on the managerial and organizational aspects of information resource and technology management: •Application of IT to operation •Artificial intelligence and expert systems technologies and issues •Business process management and modeling •Data warehousing and mining •Database management technologies and issues •Decision support and group decision support systems •Distance learning technologies and issues •Distributed software development •E-collaboration •Electronic commerce technologies and issues •Electronic government •Emerging technologies management