{"title":"资源受限多项目调度问题求解器的实验实现","authors":"K. Mihály, Mónika Kulcsárné Forrai, G. Kulcsár","doi":"10.33927/hjic-2021-22","DOIUrl":null,"url":null,"abstract":"Nowadays, project-based planning and execution are becoming more and more important in product life cycles; from the conceptual idea and its design to manufacturing and maintenance. Companies execute several projects simultaneously and these projects usually share the same resources resulting in conflicting situations. Since all projects have different requirements, constraints and goals that need to be achieved, the creation of a company-wide optimal schedule is difficult if all the aspects of each project are to be taken into consideration. Our paper presents an extended model and a scheduling problem-solving approach for resource-constrained, multi-project scheduling problems. In addition to defining the theoretical solution, its experimental implementation and results are presented.","PeriodicalId":43118,"journal":{"name":"Hungarian Journal of Industry and Chemistry","volume":null,"pages":null},"PeriodicalIF":0.5000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experimental Implementation of a Resource-Constrained Multi-Project Scheduling Problem Solver\",\"authors\":\"K. Mihály, Mónika Kulcsárné Forrai, G. Kulcsár\",\"doi\":\"10.33927/hjic-2021-22\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, project-based planning and execution are becoming more and more important in product life cycles; from the conceptual idea and its design to manufacturing and maintenance. Companies execute several projects simultaneously and these projects usually share the same resources resulting in conflicting situations. Since all projects have different requirements, constraints and goals that need to be achieved, the creation of a company-wide optimal schedule is difficult if all the aspects of each project are to be taken into consideration. Our paper presents an extended model and a scheduling problem-solving approach for resource-constrained, multi-project scheduling problems. In addition to defining the theoretical solution, its experimental implementation and results are presented.\",\"PeriodicalId\":43118,\"journal\":{\"name\":\"Hungarian Journal of Industry and Chemistry\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hungarian Journal of Industry and Chemistry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33927/hjic-2021-22\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CHEMICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hungarian Journal of Industry and Chemistry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33927/hjic-2021-22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CHEMICAL","Score":null,"Total":0}
引用次数: 0

摘要

如今,基于项目的计划和执行在产品生命周期中变得越来越重要;从概念和设计到制造和维护。公司同时执行多个项目,这些项目通常共享相同的资源,从而导致冲突的情况。由于所有项目都有不同的需求、约束和需要实现的目标,如果要考虑到每个项目的所有方面,那么创建公司范围内的最佳时间表是困难的。本文针对资源受限的多项目调度问题,提出了一个扩展模型和调度问题求解方法。给出了理论解决方案,并给出了实验实现和结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Experimental Implementation of a Resource-Constrained Multi-Project Scheduling Problem Solver
Nowadays, project-based planning and execution are becoming more and more important in product life cycles; from the conceptual idea and its design to manufacturing and maintenance. Companies execute several projects simultaneously and these projects usually share the same resources resulting in conflicting situations. Since all projects have different requirements, constraints and goals that need to be achieved, the creation of a company-wide optimal schedule is difficult if all the aspects of each project are to be taken into consideration. Our paper presents an extended model and a scheduling problem-solving approach for resource-constrained, multi-project scheduling problems. In addition to defining the theoretical solution, its experimental implementation and results are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
50.00%
发文量
9
审稿时长
6 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信