{"title":"为纸机制造项目的成本超支和进度延误提供定制的根本原因分析方法","authors":"Maha Aikhatib, S. Altarazi","doi":"10.24425/MPER.2019.129571","DOIUrl":null,"url":null,"abstract":"This study presents a customized root cause analysis approach to investigate the reasons, provide improvements measures for the cost overruns, and schedule slippage in paper-machine-building projects. The proposed approach is an analytical-survey approach that uses both actual technical data and experts’ opinions. Various analysis tools are embedded in the approach including: data collection and clustering, interviews with experts, 5-Whys, Pareto charts, cause and effect diagram, and critical ratio control charts. The approach was implemented on seven projects obtained from a leading international paper machine sup- plier. As a result, it was found that the main causes behind cost and schedule deviations are products’ related; including technical accidents in the Press section, damaged parts, de- sign issues, optimization of the machine and missing parts. Based on the results, prevention measures were perceived.","PeriodicalId":45454,"journal":{"name":"Management and Production Engineering Review","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A customized root cause analysis approach for cost overruns and schedule slippage in paper-machine-building projects\",\"authors\":\"Maha Aikhatib, S. Altarazi\",\"doi\":\"10.24425/MPER.2019.129571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study presents a customized root cause analysis approach to investigate the reasons, provide improvements measures for the cost overruns, and schedule slippage in paper-machine-building projects. The proposed approach is an analytical-survey approach that uses both actual technical data and experts’ opinions. Various analysis tools are embedded in the approach including: data collection and clustering, interviews with experts, 5-Whys, Pareto charts, cause and effect diagram, and critical ratio control charts. The approach was implemented on seven projects obtained from a leading international paper machine sup- plier. As a result, it was found that the main causes behind cost and schedule deviations are products’ related; including technical accidents in the Press section, damaged parts, de- sign issues, optimization of the machine and missing parts. Based on the results, prevention measures were perceived.\",\"PeriodicalId\":45454,\"journal\":{\"name\":\"Management and Production Engineering Review\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Management and Production Engineering Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/MPER.2019.129571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management and Production Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/MPER.2019.129571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
A customized root cause analysis approach for cost overruns and schedule slippage in paper-machine-building projects
This study presents a customized root cause analysis approach to investigate the reasons, provide improvements measures for the cost overruns, and schedule slippage in paper-machine-building projects. The proposed approach is an analytical-survey approach that uses both actual technical data and experts’ opinions. Various analysis tools are embedded in the approach including: data collection and clustering, interviews with experts, 5-Whys, Pareto charts, cause and effect diagram, and critical ratio control charts. The approach was implemented on seven projects obtained from a leading international paper machine sup- plier. As a result, it was found that the main causes behind cost and schedule deviations are products’ related; including technical accidents in the Press section, damaged parts, de- sign issues, optimization of the machine and missing parts. Based on the results, prevention measures were perceived.
期刊介绍:
Management and Production Engineering Review (MPER) is a peer-refereed, international, multidisciplinary journal covering a broad spectrum of topics in production engineering and management. Production engineering is a currently developing stream of science encompassing planning, design, implementation and management of production and logistic systems. Orientation towards human resources factor differentiates production engineering from other technical disciplines. The journal aims to advance the theoretical and applied knowledge of this rapidly evolving field, with a special focus on production management, organisation of production processes, management of production knowledge, computer integrated management of production flow, enterprise effectiveness, maintainability and sustainable manufacturing, productivity and organisation, forecasting, modelling and simulation, decision making systems, project management, innovation management and technology transfer, quality engineering and safety at work, supply chain optimization and logistics. Management and Production Engineering Review is published under the auspices of the Polish Academy of Sciences Committee on Production Engineering and Polish Association for Production Management.