七段复杂水平井三维井眼轨迹设计

Yuecheng Wang, Minqi Li, Hao Tan
{"title":"七段复杂水平井三维井眼轨迹设计","authors":"Yuecheng Wang, Minqi Li, Hao Tan","doi":"10.23977/jemm.2022.070310","DOIUrl":null,"url":null,"abstract":": In this paper, a three-dimensional borehole track design is carried out for complex horizontal wells. Based on the two-dimensional borehole track model, a seven-segment ideal three-dimensional borehole track model is established by considering the parameter range, frictional torque and resistance, and borehole track positioning hit rate. After that, Monte Carlo simulation is applied to find the optimal design of the borehole track. Based on fuzzy comprehensive evaluation, horizontal well drilling completion acceptance criteria are established. Three evaluation factors of cost, risk, and difficulty of construction are determined to constitute the factor set; five rubrics of excellent, good, moderate, qualified and unqualified are used to constitute the evaluation set. After deriving the affiliation matrix, the final evaluation criteria are determined by using the fuzzy judgment matrix to calculate the superiority and inferiority ratings of the mechanical probability model compared with the developed criteria.","PeriodicalId":32485,"journal":{"name":"Journal of Engineering Mechanics and Machinery","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Seven-stage complex horizontal well 3D borehole track design\",\"authors\":\"Yuecheng Wang, Minqi Li, Hao Tan\",\"doi\":\"10.23977/jemm.2022.070310\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": In this paper, a three-dimensional borehole track design is carried out for complex horizontal wells. Based on the two-dimensional borehole track model, a seven-segment ideal three-dimensional borehole track model is established by considering the parameter range, frictional torque and resistance, and borehole track positioning hit rate. After that, Monte Carlo simulation is applied to find the optimal design of the borehole track. Based on fuzzy comprehensive evaluation, horizontal well drilling completion acceptance criteria are established. Three evaluation factors of cost, risk, and difficulty of construction are determined to constitute the factor set; five rubrics of excellent, good, moderate, qualified and unqualified are used to constitute the evaluation set. After deriving the affiliation matrix, the final evaluation criteria are determined by using the fuzzy judgment matrix to calculate the superiority and inferiority ratings of the mechanical probability model compared with the developed criteria.\",\"PeriodicalId\":32485,\"journal\":{\"name\":\"Journal of Engineering Mechanics and Machinery\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Mechanics and Machinery\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23977/jemm.2022.070310\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Mechanics and Machinery","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23977/jemm.2022.070310","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文对复杂水平井进行了三维井眼轨迹设计。在二维井眼轨迹模型的基础上,考虑参数范围、摩擦力矩和阻力、井眼轨迹定位命中率,建立了理想的七段三维井眼轨迹模型。在此基础上,采用蒙特卡罗仿真方法对钻孔轨迹进行优化设计。在模糊综合评价的基础上,建立了水平井钻井完井验收标准。确定了成本、风险和施工难度三个评价因素构成因素集;采用优、良、中、合格、不合格五个指标构成评价集。推导出隶属矩阵后,利用模糊判断矩阵计算力学概率模型与所制定的准则的优劣等级,确定最终的评价准则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Seven-stage complex horizontal well 3D borehole track design
: In this paper, a three-dimensional borehole track design is carried out for complex horizontal wells. Based on the two-dimensional borehole track model, a seven-segment ideal three-dimensional borehole track model is established by considering the parameter range, frictional torque and resistance, and borehole track positioning hit rate. After that, Monte Carlo simulation is applied to find the optimal design of the borehole track. Based on fuzzy comprehensive evaluation, horizontal well drilling completion acceptance criteria are established. Three evaluation factors of cost, risk, and difficulty of construction are determined to constitute the factor set; five rubrics of excellent, good, moderate, qualified and unqualified are used to constitute the evaluation set. After deriving the affiliation matrix, the final evaluation criteria are determined by using the fuzzy judgment matrix to calculate the superiority and inferiority ratings of the mechanical probability model compared with the developed criteria.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信