{"title":"不稳定建设项目识别分析","authors":"T. Kasprowicz, R. Wójcik","doi":"10.22630/PNIKS.2019.28.2.27","DOIUrl":null,"url":null,"abstract":"Construction project means the arrangement of the implementation of works as well as the erection, reconstruction, assemblage, repair or demolition of the construction object. Within the framework of the project, the life cycle of the construction object is investigated, the feasibility of project is analyzed, the construction object is designed and executed or renovated, or dismantled. In order to ensure a comprehensive analysis and its results, the construction project life cycle has been proposed. This cycle consists stages: feasibility study, designing, implementation, operation and maintenance of the construction object. In each stage are systematically carried out activities related to the implementation of part or whole of the object’s life cycle. This approach provides a comprehensive analysis of conditions, successful designing, implementation, operation and maintenance of the construction object.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Analiza identyfikacyjna niestabilnych przedsięwzięć budowlanych\",\"authors\":\"T. Kasprowicz, R. Wójcik\",\"doi\":\"10.22630/PNIKS.2019.28.2.27\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction project means the arrangement of the implementation of works as well as the erection, reconstruction, assemblage, repair or demolition of the construction object. Within the framework of the project, the life cycle of the construction object is investigated, the feasibility of project is analyzed, the construction object is designed and executed or renovated, or dismantled. In order to ensure a comprehensive analysis and its results, the construction project life cycle has been proposed. This cycle consists stages: feasibility study, designing, implementation, operation and maintenance of the construction object. In each stage are systematically carried out activities related to the implementation of part or whole of the object’s life cycle. This approach provides a comprehensive analysis of conditions, successful designing, implementation, operation and maintenance of the construction object.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/PNIKS.2019.28.2.27\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/PNIKS.2019.28.2.27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
Construction project means the arrangement of the implementation of works as well as the erection, reconstruction, assemblage, repair or demolition of the construction object. Within the framework of the project, the life cycle of the construction object is investigated, the feasibility of project is analyzed, the construction object is designed and executed or renovated, or dismantled. In order to ensure a comprehensive analysis and its results, the construction project life cycle has been proposed. This cycle consists stages: feasibility study, designing, implementation, operation and maintenance of the construction object. In each stage are systematically carried out activities related to the implementation of part or whole of the object’s life cycle. This approach provides a comprehensive analysis of conditions, successful designing, implementation, operation and maintenance of the construction object.
期刊介绍:
Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.