{"title":"ITER项目及其超导线圈","authors":"Kiyoshi Yoshida","doi":"10.2221/JCSJ.37.190","DOIUrl":null,"url":null,"abstract":"The design and development of the International Thermonuclear Experiment Reactor (ITER) have been under way since 1992, based on the international agreement of the Engineering Design Activities (EDA). The design of the main machine and the development of key components were successfully completed by July 2001. The technical specifications of the ITER machine are being prepared for the order of its fabrications in the Coordinated Technical Activities (CTA). The construction of ITER is expected to start by 2005. The ITER machine uses superconducting coils to confine and shape the plasma, and the coil system must be reliably operated to perform the plasma experiment. The system accounts for 28% of the direct ITER capital costs and requires a long manufacturing period (6 years and 6 months). The strand for the superconducting conductor is the first procurement component in the ITER. This paper explains the present design and status of the ITER project and its superconducting coils.","PeriodicalId":93144,"journal":{"name":"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]","volume":"37 1","pages":"190-201"},"PeriodicalIF":0.0000,"publicationDate":"2002-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ITER Project and its Superconducting Coils\",\"authors\":\"Kiyoshi Yoshida\",\"doi\":\"10.2221/JCSJ.37.190\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The design and development of the International Thermonuclear Experiment Reactor (ITER) have been under way since 1992, based on the international agreement of the Engineering Design Activities (EDA). The design of the main machine and the development of key components were successfully completed by July 2001. The technical specifications of the ITER machine are being prepared for the order of its fabrications in the Coordinated Technical Activities (CTA). The construction of ITER is expected to start by 2005. The ITER machine uses superconducting coils to confine and shape the plasma, and the coil system must be reliably operated to perform the plasma experiment. The system accounts for 28% of the direct ITER capital costs and requires a long manufacturing period (6 years and 6 months). The strand for the superconducting conductor is the first procurement component in the ITER. This paper explains the present design and status of the ITER project and its superconducting coils.\",\"PeriodicalId\":93144,\"journal\":{\"name\":\"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]\",\"volume\":\"37 1\",\"pages\":\"190-201\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2221/JCSJ.37.190\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2221/JCSJ.37.190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

国际热核实验反应堆(ITER)的设计和开发工作自1992年以来一直在进行,其基础是工程设计活动(EDA)的国际协议。2001年7月,成功完成了主机的设计和关键部件的研制。正在编制ITER机器的技术规格,以便在协调技术活动(CTA)中订购其制造。ITER的建设预计将于2005年开始。ITER机器使用超导线圈来限制和塑造等离子体,线圈系统必须可靠地运行才能进行等离子体实验。该系统占ITER直接资本成本的28%,并且需要很长的制造周期(6年零6个月)。超导导体链是ITER的第一个采购部件。本文介绍了ITER项目及其超导线圈的设计现状。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ITER Project and its Superconducting Coils
The design and development of the International Thermonuclear Experiment Reactor (ITER) have been under way since 1992, based on the international agreement of the Engineering Design Activities (EDA). The design of the main machine and the development of key components were successfully completed by July 2001. The technical specifications of the ITER machine are being prepared for the order of its fabrications in the Coordinated Technical Activities (CTA). The construction of ITER is expected to start by 2005. The ITER machine uses superconducting coils to confine and shape the plasma, and the coil system must be reliably operated to perform the plasma experiment. The system accounts for 28% of the direct ITER capital costs and requires a long manufacturing period (6 years and 6 months). The strand for the superconducting conductor is the first procurement component in the ITER. This paper explains the present design and status of the ITER project and its superconducting coils.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信