有能力的同行机调度问题:一种具有序列相关设置成本和不同到期日的新公式

IF 1.9 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL
Milad Mohammadi, Hadi Shahmoradi, M. Esmaelian, A. Sobhani
{"title":"有能力的同行机调度问题:一种具有序列相关设置成本和不同到期日的新公式","authors":"Milad Mohammadi, Hadi Shahmoradi, M. Esmaelian, A. Sobhani","doi":"10.1504/EJIE.2021.10037978","DOIUrl":null,"url":null,"abstract":": This paper schedules capacitated parallel machines of a real production system by considering different quantities of production and processing times required to complete customer orders. A new mixed linear programming model is developed according to the concept of constrained vehicle routing problems to have a complete schedule for machines by determining the sequence of both jobs and idle times for each machine. The optimisation model minimises the total cost of the production system, including tardiness, earliness and sequence-dependent setup costs. A constraint programming (CP) model and a meta-heuristic hybrid algorithm are also developed to compare their results with the mixed linear programming model. The numerical findings show that the total cost estimated by the mixed integer programming model is 10%–13% better (lower) than the ones estimated by the","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Scheduling the Capacitated Identical Parallel Machines Problem: A New Formulation with Sequence-Dependent Setup Costs and Different Due Dates\",\"authors\":\"Milad Mohammadi, Hadi Shahmoradi, M. Esmaelian, A. Sobhani\",\"doi\":\"10.1504/EJIE.2021.10037978\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": This paper schedules capacitated parallel machines of a real production system by considering different quantities of production and processing times required to complete customer orders. A new mixed linear programming model is developed according to the concept of constrained vehicle routing problems to have a complete schedule for machines by determining the sequence of both jobs and idle times for each machine. The optimisation model minimises the total cost of the production system, including tardiness, earliness and sequence-dependent setup costs. A constraint programming (CP) model and a meta-heuristic hybrid algorithm are also developed to compare their results with the mixed linear programming model. The numerical findings show that the total cost estimated by the mixed integer programming model is 10%–13% better (lower) than the ones estimated by the\",\"PeriodicalId\":51047,\"journal\":{\"name\":\"European Journal of Industrial Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1504/EJIE.2021.10037978\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2021.10037978","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 4

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
Scheduling the Capacitated Identical Parallel Machines Problem: A New Formulation with Sequence-Dependent Setup Costs and Different Due Dates
: This paper schedules capacitated parallel machines of a real production system by considering different quantities of production and processing times required to complete customer orders. A new mixed linear programming model is developed according to the concept of constrained vehicle routing problems to have a complete schedule for machines by determining the sequence of both jobs and idle times for each machine. The optimisation model minimises the total cost of the production system, including tardiness, earliness and sequence-dependent setup costs. A constraint programming (CP) model and a meta-heuristic hybrid algorithm are also developed to compare their results with the mixed linear programming model. The numerical findings show that the total cost estimated by the mixed integer programming model is 10%–13% better (lower) than the ones estimated by the
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信