露天矿连续时间内铲式分配的短期生产调度

Q3 Engineering
S. Upadhyay, J. Doucette, Hooman Askari Nasab
{"title":"露天矿连续时间内铲式分配的短期生产调度","authors":"S. Upadhyay, J. Doucette, Hooman Askari Nasab","doi":"10.1504/ijmme.2021.10045510","DOIUrl":null,"url":null,"abstract":"Short term mine production scheduling is essential to attain the desired capacity utilization of equipment, meet blending targets and adhere to the strategic schedules. Although, several optimization models exist in the literature, size and complexity remains a problem which poses a limitation to solve and generate the schedules at smaller resolutions for larger time frames. This paper presents a short term production scheduling model which allocates shovels over continuous time frames, thus controlling the model size from growing with the resolution. This approach also models the mine operating environment in a more representative way to create practical and achievable schedules. A verification study of the model is presented in this paper using an iron ore mine case study. A comparison of solutions in the pareto optimal space also justifies the goal optimization as an efficient approach to attain best outcomes from among multiple conflicting objectives of the problem.","PeriodicalId":38622,"journal":{"name":"International Journal of Mining and Mineral Engineering","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Short-term production scheduling in open pit mines with shovel allocations over continuous time frames\",\"authors\":\"S. Upadhyay, J. Doucette, Hooman Askari Nasab\",\"doi\":\"10.1504/ijmme.2021.10045510\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Short term mine production scheduling is essential to attain the desired capacity utilization of equipment, meet blending targets and adhere to the strategic schedules. Although, several optimization models exist in the literature, size and complexity remains a problem which poses a limitation to solve and generate the schedules at smaller resolutions for larger time frames. This paper presents a short term production scheduling model which allocates shovels over continuous time frames, thus controlling the model size from growing with the resolution. This approach also models the mine operating environment in a more representative way to create practical and achievable schedules. A verification study of the model is presented in this paper using an iron ore mine case study. A comparison of solutions in the pareto optimal space also justifies the goal optimization as an efficient approach to attain best outcomes from among multiple conflicting objectives of the problem.\",\"PeriodicalId\":38622,\"journal\":{\"name\":\"International Journal of Mining and Mineral Engineering\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining and Mineral Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijmme.2021.10045510\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Mineral Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijmme.2021.10045510","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 3

摘要

矿山短期生产调度是实现设备预期产能利用率、实现调配目标、坚持战略计划的关键。虽然文献中存在一些优化模型,但尺寸和复杂性仍然是一个问题,这限制了在更大的时间框架下以更小的分辨率求解和生成调度。本文提出了一种短期生产调度模型,该模型在连续时间框架内分配铲斗,从而控制了模型尺寸随分辨率的增长。这种方法还以更有代表性的方式模拟矿山作业环境,以制定实际可行的时间表。以某铁矿为例,对该模型进行了验证研究。通过对pareto最优空间解的比较,也证明了目标优化是一种从问题的多个冲突目标中获得最佳结果的有效方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Short-term production scheduling in open pit mines with shovel allocations over continuous time frames
Short term mine production scheduling is essential to attain the desired capacity utilization of equipment, meet blending targets and adhere to the strategic schedules. Although, several optimization models exist in the literature, size and complexity remains a problem which poses a limitation to solve and generate the schedules at smaller resolutions for larger time frames. This paper presents a short term production scheduling model which allocates shovels over continuous time frames, thus controlling the model size from growing with the resolution. This approach also models the mine operating environment in a more representative way to create practical and achievable schedules. A verification study of the model is presented in this paper using an iron ore mine case study. A comparison of solutions in the pareto optimal space also justifies the goal optimization as an efficient approach to attain best outcomes from among multiple conflicting objectives of the problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Mining and Mineral Engineering
International Journal of Mining and Mineral Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
1.90
自引率
0.00%
发文量
1
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信