需求和产品回收率不确定的再制造决策

Q4 Economics, Econometrics and Finance
S. Mukhopadhyay, Huafan Ma
{"title":"需求和产品回收率不确定的再制造决策","authors":"S. Mukhopadhyay, Huafan Ma","doi":"10.1504/ijrm.2015.073828","DOIUrl":null,"url":null,"abstract":"In this paper, we consider a supply chain with one original equipment manufacturer (OEM) and one retailer. The OEM can process both used and new parts for the production of new products. The yield of the used parts procured for remanufacturing is random. The OEM makes procurement and production decisions and the retailer makes ordering decisions based on their own cost/incentive structures. The two parties in the supply chain use either a push or a pull contract to trade with each other. We consider both short- and long-manufacturing lead times. We develop models to obtain their optimal policies for different scenarios depending on the contract type and the information the OEM has about the random yield rate. We compare the results of different scenarios and develop managerial insights. We also carry out numerical analysis and evaluate the supply chain performance.","PeriodicalId":39519,"journal":{"name":"International Journal of Revenue Management","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2015-12-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/ijrm.2015.073828","citationCount":"2","resultStr":"{\"title\":\"Remanufacturing decisions with uncertain demand and product return yield\",\"authors\":\"S. Mukhopadhyay, Huafan Ma\",\"doi\":\"10.1504/ijrm.2015.073828\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we consider a supply chain with one original equipment manufacturer (OEM) and one retailer. The OEM can process both used and new parts for the production of new products. The yield of the used parts procured for remanufacturing is random. The OEM makes procurement and production decisions and the retailer makes ordering decisions based on their own cost/incentive structures. The two parties in the supply chain use either a push or a pull contract to trade with each other. We consider both short- and long-manufacturing lead times. We develop models to obtain their optimal policies for different scenarios depending on the contract type and the information the OEM has about the random yield rate. We compare the results of different scenarios and develop managerial insights. We also carry out numerical analysis and evaluate the supply chain performance.\",\"PeriodicalId\":39519,\"journal\":{\"name\":\"International Journal of Revenue Management\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1504/ijrm.2015.073828\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Revenue Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijrm.2015.073828\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Economics, Econometrics and Finance\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Revenue Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijrm.2015.073828","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Economics, Econometrics and Finance","Score":null,"Total":0}
引用次数: 2

摘要

本文考虑一个由一个原始设备制造商(OEM)和一个零售商组成的供应链。OEM既可以加工旧零件,也可以加工新零件,用于生产新产品。采购用于再制造的旧零件的成品率是随机的。原始设备制造商根据自己的成本/激励结构做出采购和生产决策,零售商根据自己的成本/激励结构做出订购决策。供应链中的双方使用推式或拉式合同相互交易。我们同时考虑短期和长期的制造交货期。我们开发模型,根据合同类型和原始设备制造商关于随机产出率的信息,获得不同情况下的最优策略。我们比较不同情景的结果,并发展管理见解。我们还对供应链绩效进行了数值分析和评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Remanufacturing decisions with uncertain demand and product return yield
In this paper, we consider a supply chain with one original equipment manufacturer (OEM) and one retailer. The OEM can process both used and new parts for the production of new products. The yield of the used parts procured for remanufacturing is random. The OEM makes procurement and production decisions and the retailer makes ordering decisions based on their own cost/incentive structures. The two parties in the supply chain use either a push or a pull contract to trade with each other. We consider both short- and long-manufacturing lead times. We develop models to obtain their optimal policies for different scenarios depending on the contract type and the information the OEM has about the random yield rate. We compare the results of different scenarios and develop managerial insights. We also carry out numerical analysis and evaluate the supply chain performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Revenue Management
International Journal of Revenue Management Economics, Econometrics and Finance-Economics and Econometrics
CiteScore
1.40
自引率
0.00%
发文量
4
期刊介绍: The IJRM is an interdisciplinary and refereed journal that provides authoritative sources of reference and an international forum in the field of revenue management. IJRM publishes well-written and academically rigorous manuscripts. Both theoretic development and applied research are welcome.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信