需求预测更新在装配系统部件采购管理中的价值

James Cao, K. C. So
{"title":"需求预测更新在装配系统部件采购管理中的价值","authors":"James Cao, K. C. So","doi":"10.1080/0740817X.2016.1189630","DOIUrl":null,"url":null,"abstract":"ABSTRACT This article examines the value of demand forecast updates in an assembly system where a single assembler must order components from independent suppliers with different lead times. By staggering each ordering time, the assembler can utilize the latest market information, as it is developed, to form a better forecast over time. The updated forecast can subsequently be used to decide the following procurement decision. The objective of this research is to understand the specific operating environment under which demand forecast updates are most beneficial. Using a uniform demand adjustment model, we are able to derive analytical results that allow us to quantify the impact of demand forecast updates. We show that forecast updates can drastically improve profitability by reducing the mismatch cost caused by demand uncertainty.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"48 1","pages":"1198 - 1216"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0740817X.2016.1189630","citationCount":"3","resultStr":"{\"title\":\"The value of demand forecast updates in managing component procurement for assembly systems\",\"authors\":\"James Cao, K. C. So\",\"doi\":\"10.1080/0740817X.2016.1189630\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT This article examines the value of demand forecast updates in an assembly system where a single assembler must order components from independent suppliers with different lead times. By staggering each ordering time, the assembler can utilize the latest market information, as it is developed, to form a better forecast over time. The updated forecast can subsequently be used to decide the following procurement decision. The objective of this research is to understand the specific operating environment under which demand forecast updates are most beneficial. Using a uniform demand adjustment model, we are able to derive analytical results that allow us to quantify the impact of demand forecast updates. We show that forecast updates can drastically improve profitability by reducing the mismatch cost caused by demand uncertainty.\",\"PeriodicalId\":13379,\"journal\":{\"name\":\"IIE Transactions\",\"volume\":\"48 1\",\"pages\":\"1198 - 1216\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0740817X.2016.1189630\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IIE Transactions\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/0740817X.2016.1189630\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0740817X.2016.1189630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文研究了在装配系统中需求预测更新的价值,其中单个装配商必须从具有不同交货时间的独立供应商处订购组件。通过错开每次订货时间,装配商可以利用最新的市场信息,随着时间的推移,形成一个更好的预测。更新后的预测随后可用于决定以下采购决策。本研究的目的是了解需求预测更新最有益的具体运营环境。使用统一的需求调整模型,我们能够得出分析结果,使我们能够量化需求预测更新的影响。我们表明,预测更新可以通过减少由需求不确定性引起的不匹配成本来大幅提高盈利能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The value of demand forecast updates in managing component procurement for assembly systems
ABSTRACT This article examines the value of demand forecast updates in an assembly system where a single assembler must order components from independent suppliers with different lead times. By staggering each ordering time, the assembler can utilize the latest market information, as it is developed, to form a better forecast over time. The updated forecast can subsequently be used to decide the following procurement decision. The objective of this research is to understand the specific operating environment under which demand forecast updates are most beneficial. Using a uniform demand adjustment model, we are able to derive analytical results that allow us to quantify the impact of demand forecast updates. We show that forecast updates can drastically improve profitability by reducing the mismatch cost caused by demand uncertainty.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信