装配订单系统的双指标生产和分包政策

A. Sinha, A. Krishnamurthy
{"title":"装配订单系统的双指标生产和分包政策","authors":"A. Sinha, A. Krishnamurthy","doi":"10.1080/0740817X.2015.1110652","DOIUrl":null,"url":null,"abstract":"ABSTRACT We analyze tradeoffs related to production and subcontracting decisions in an assemble-to-order system with capacity constraints and stochastic lead times. We assume that component replenishment is carried out by orders to a subcontractor and component stock levels at the manufacturer are determined by dual index-based policies. Furthermore, customer demands for the final product are immediately satisfied if all of the required components are in stock; otherwise, they are back-ordered. In order to maintain high service levels, the manufacturer reserves the option to produce components internally. Using queuing models, we analyze the tradeoffs related to internal manufacturing versus subcontracting under different types of dual index policies. We use Matrix-Geometric methods to conduct an exact analysis for an assemble-to-order system with two components and develop a decomposition-based algorithm to analyze the performance of systems with more than two products. Numerical studies provide useful insights on the performance of the various dual index policies under study.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"48 1","pages":"415 - 427"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0740817X.2015.1110652","citationCount":"4","resultStr":"{\"title\":\"Dual index production and subcontracting policies for assemble-to-order systems\",\"authors\":\"A. Sinha, A. Krishnamurthy\",\"doi\":\"10.1080/0740817X.2015.1110652\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT We analyze tradeoffs related to production and subcontracting decisions in an assemble-to-order system with capacity constraints and stochastic lead times. We assume that component replenishment is carried out by orders to a subcontractor and component stock levels at the manufacturer are determined by dual index-based policies. Furthermore, customer demands for the final product are immediately satisfied if all of the required components are in stock; otherwise, they are back-ordered. In order to maintain high service levels, the manufacturer reserves the option to produce components internally. Using queuing models, we analyze the tradeoffs related to internal manufacturing versus subcontracting under different types of dual index policies. We use Matrix-Geometric methods to conduct an exact analysis for an assemble-to-order system with two components and develop a decomposition-based algorithm to analyze the performance of systems with more than two products. Numerical studies provide useful insights on the performance of the various dual index policies under study.\",\"PeriodicalId\":13379,\"journal\":{\"name\":\"IIE Transactions\",\"volume\":\"48 1\",\"pages\":\"415 - 427\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0740817X.2015.1110652\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IIE Transactions\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/0740817X.2015.1110652\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0740817X.2015.1110652","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

摘要:本文分析了在产能约束和随机交货期的装配订单系统中与生产和分包决策相关的权衡。我们假设组件补充是由分包商的订单执行的,制造商的组件库存水平由基于双指数的策略决定。此外,如果所有所需的部件都有库存,则客户对最终产品的需求立即得到满足;否则,它们就会缺货。为了保持较高的服务水平,制造商保留内部生产组件的选择。利用排队模型,我们分析了在不同类型的双指标政策下内部制造与分包的权衡。我们使用矩阵几何方法对具有两个组件的装配顺序系统进行精确分析,并开发了基于分解的算法来分析具有两个以上产品的系统的性能。数值研究对所研究的各种双指数政策的性能提供了有用的见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dual index production and subcontracting policies for assemble-to-order systems
ABSTRACT We analyze tradeoffs related to production and subcontracting decisions in an assemble-to-order system with capacity constraints and stochastic lead times. We assume that component replenishment is carried out by orders to a subcontractor and component stock levels at the manufacturer are determined by dual index-based policies. Furthermore, customer demands for the final product are immediately satisfied if all of the required components are in stock; otherwise, they are back-ordered. In order to maintain high service levels, the manufacturer reserves the option to produce components internally. Using queuing models, we analyze the tradeoffs related to internal manufacturing versus subcontracting under different types of dual index policies. We use Matrix-Geometric methods to conduct an exact analysis for an assemble-to-order system with two components and develop a decomposition-based algorithm to analyze the performance of systems with more than two products. Numerical studies provide useful insights on the performance of the various dual index policies under study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信