{"title":"具有相关故障过程和时变安装基础的可修系统的可靠性分析和备件供应","authors":"Xiao Liu, L. Tang","doi":"10.1080/0740817X.2015.1055391","DOIUrl":null,"url":null,"abstract":"ABSTRACT Line Replaceable Units (LRUs), which can be quickly replaced at a first-level maintenance facility, are widely deployed on capital-intensive systems in order to maintain high system availability. Failed LRU are repaired after replacement and reused as fully serviceable spare units. Demand for spare LRUs depends on factors such as the time-varying installed base, reliability deterioration or growth over maintenance cycles, procurement leadtime of new LRUs, turn-around leadtime of repaired LRUs, etc. In this article, we propose an integrated framework for both reliability analysis and spares provisioning for LRUs with a time-varying installed base. We assume that each system consists of multiple types of LRUs and associated with each type of LRU is a non-stationary sub-failure process. The failure of a system is triggered by sub-failure processes that are statistically dependent. A hierarchical probability model is developed for the demand forecasting of LRUs. Based on the forecasted demand, the optimum inventory level is found through dynamic programming. An application example is presented. A computer program, called the Integrated Platform for Reliability Analysis and Spare Provision, is available that makes the proposed methods readily applicable.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"48 1","pages":"43 - 56"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0740817X.2015.1055391","citationCount":"18","resultStr":"{\"title\":\"Reliability analysis and spares provisioning for repairable systems with dependent failure processes and a time-varying installed base\",\"authors\":\"Xiao Liu, L. Tang\",\"doi\":\"10.1080/0740817X.2015.1055391\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Line Replaceable Units (LRUs), which can be quickly replaced at a first-level maintenance facility, are widely deployed on capital-intensive systems in order to maintain high system availability. Failed LRU are repaired after replacement and reused as fully serviceable spare units. Demand for spare LRUs depends on factors such as the time-varying installed base, reliability deterioration or growth over maintenance cycles, procurement leadtime of new LRUs, turn-around leadtime of repaired LRUs, etc. In this article, we propose an integrated framework for both reliability analysis and spares provisioning for LRUs with a time-varying installed base. We assume that each system consists of multiple types of LRUs and associated with each type of LRU is a non-stationary sub-failure process. The failure of a system is triggered by sub-failure processes that are statistically dependent. A hierarchical probability model is developed for the demand forecasting of LRUs. Based on the forecasted demand, the optimum inventory level is found through dynamic programming. An application example is presented. A computer program, called the Integrated Platform for Reliability Analysis and Spare Provision, is available that makes the proposed methods readily applicable.\",\"PeriodicalId\":13379,\"journal\":{\"name\":\"IIE Transactions\",\"volume\":\"48 1\",\"pages\":\"43 - 56\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0740817X.2015.1055391\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IIE Transactions\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/0740817X.2015.1055391\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0740817X.2015.1055391","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

摘要

线路可更换单元(lru)是一种可以在一级维护设施中快速更换的设备,被广泛应用于资本密集型系统中,以保持系统的高可用性。故障的LRU在更换后进行维修,并作为完全可用的备用单元重新使用。对备用lru的需求取决于各种因素,如时变的安装基数、可靠性在维护周期中的恶化或增长、新lru的采购前置时间、维修后lru的周转前置时间等。在本文中,我们提出了一个集成框架,用于具有时变安装基础的lru的可靠性分析和备件供应。我们假设每个系统由多种类型的LRU组成,并且与每种LRU相关联的是非平稳子故障过程。系统的故障是由统计相关的子故障过程触发的。提出了一种分层概率模型,用于lru的需求预测。在预测需求的基础上,通过动态规划找到最优库存水平。给出了一个应用实例。有一个计算机程序,称为可靠性分析和备用供应综合平台,使所提出的方法易于应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability analysis and spares provisioning for repairable systems with dependent failure processes and a time-varying installed base
ABSTRACT Line Replaceable Units (LRUs), which can be quickly replaced at a first-level maintenance facility, are widely deployed on capital-intensive systems in order to maintain high system availability. Failed LRU are repaired after replacement and reused as fully serviceable spare units. Demand for spare LRUs depends on factors such as the time-varying installed base, reliability deterioration or growth over maintenance cycles, procurement leadtime of new LRUs, turn-around leadtime of repaired LRUs, etc. In this article, we propose an integrated framework for both reliability analysis and spares provisioning for LRUs with a time-varying installed base. We assume that each system consists of multiple types of LRUs and associated with each type of LRU is a non-stationary sub-failure process. The failure of a system is triggered by sub-failure processes that are statistically dependent. A hierarchical probability model is developed for the demand forecasting of LRUs. Based on the forecasted demand, the optimum inventory level is found through dynamic programming. An application example is presented. A computer program, called the Integrated Platform for Reliability Analysis and Spare Provision, is available that makes the proposed methods readily applicable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信