{"title":"在个人计算机上优化水轮机调度","authors":"Bojan Novak, Peter Kokol","doi":"10.1016/0141-1195(90)90041-4","DOIUrl":null,"url":null,"abstract":"<div><p>The purpose of optimal short-term scheduling is to maximize electrical energy production depending on the natural water inflows of a river, according to a daily load duration curve and the operation of thermal power plants with minimal oscillating load. Thermal power plants have a long start-up time and cannot follow changes in load demand so they are used to cover the constant part of the load, but peaks in load demand are covered by hydro units. A new mathematical model of a hydro plant chain was developed which used only two, instead of three, variables. The optimization algorithm used Newton's method which is applied on the exact <span><math><mtext>L</mtext></math></span> penalty function which allows a nonfeasible starting point so no phase <span><math><mtext>I</mtext></math></span> simplex or projection method is needed at the beginning. The mathematical model was implemented on a PC as a computer program using the FORTRAN 77 programming language and spreadsheet software. The program was applied to a hydro-chain on the river Drava. Preliminary results show that applying optimization techniques can greatly reduce costs of operating a hydro plant chain.</p></div>","PeriodicalId":100043,"journal":{"name":"Advances in Engineering Software (1978)","volume":"12 1","pages":"Pages 45-49"},"PeriodicalIF":0.0000,"publicationDate":"1990-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0141-1195(90)90041-4","citationCount":"1","resultStr":"{\"title\":\"Optimal hydro-termo scheduling on a personal computer\",\"authors\":\"Bojan Novak, Peter Kokol\",\"doi\":\"10.1016/0141-1195(90)90041-4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The purpose of optimal short-term scheduling is to maximize electrical energy production depending on the natural water inflows of a river, according to a daily load duration curve and the operation of thermal power plants with minimal oscillating load. Thermal power plants have a long start-up time and cannot follow changes in load demand so they are used to cover the constant part of the load, but peaks in load demand are covered by hydro units. A new mathematical model of a hydro plant chain was developed which used only two, instead of three, variables. The optimization algorithm used Newton's method which is applied on the exact <span><math><mtext>L</mtext></math></span> penalty function which allows a nonfeasible starting point so no phase <span><math><mtext>I</mtext></math></span> simplex or projection method is needed at the beginning. The mathematical model was implemented on a PC as a computer program using the FORTRAN 77 programming language and spreadsheet software. The program was applied to a hydro-chain on the river Drava. Preliminary results show that applying optimization techniques can greatly reduce costs of operating a hydro plant chain.</p></div>\",\"PeriodicalId\":100043,\"journal\":{\"name\":\"Advances in Engineering Software (1978)\",\"volume\":\"12 1\",\"pages\":\"Pages 45-49\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1990-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0141-1195(90)90041-4\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Engineering Software (1978)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0141119590900414\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Engineering Software (1978)","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0141119590900414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimal hydro-termo scheduling on a personal computer
The purpose of optimal short-term scheduling is to maximize electrical energy production depending on the natural water inflows of a river, according to a daily load duration curve and the operation of thermal power plants with minimal oscillating load. Thermal power plants have a long start-up time and cannot follow changes in load demand so they are used to cover the constant part of the load, but peaks in load demand are covered by hydro units. A new mathematical model of a hydro plant chain was developed which used only two, instead of three, variables. The optimization algorithm used Newton's method which is applied on the exact penalty function which allows a nonfeasible starting point so no phase simplex or projection method is needed at the beginning. The mathematical model was implemented on a PC as a computer program using the FORTRAN 77 programming language and spreadsheet software. The program was applied to a hydro-chain on the river Drava. Preliminary results show that applying optimization techniques can greatly reduce costs of operating a hydro plant chain.