尼日利亚建筑业返工风险触发因素分析

IF 1.6 Q3 MANAGEMENT
E. Eze, J. E. Idiake, B. O. Ganiyu
{"title":"尼日利亚建筑业返工风险触发因素分析","authors":"E. Eze, J. E. Idiake, B. O. Ganiyu","doi":"10.2478/otmcj-2018-0008","DOIUrl":null,"url":null,"abstract":"Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1778 - 1793"},"PeriodicalIF":1.6000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Analysis of rework risk triggers in the Nigerian construction industry\",\"authors\":\"E. Eze, J. E. Idiake, B. O. Ganiyu\",\"doi\":\"10.2478/otmcj-2018-0008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"10 1\",\"pages\":\"1778 - 1793\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2018-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2018-0008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2018-0008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 10

摘要

摘要建筑业在许多国家的基础设施发展中发挥着重要作用。尽管技术和专业水平都很先进,但建筑项目却遭遇了很多挫折。因此,这项研究评估了尼日利亚建筑业中引发返工的因素以及消除此类因素所带来的好处。该研究采用了定量调查方法,采用结构化问卷作为研究工具。采用主成分分析法进行因素分析,以确定引发返工的因素以及这些因素之间存在的关系模式;相对重要性指数(RII)用于评估消除返工触发因素的益处。该研究得出结论,引发返工的因素包括遗漏和规划问题、变更问题、资金和沟通问题,以及工人和资源控制不力。重复光顾,提高生产力,缩短交货时间,减少返工和浪费,提高员工工作满意度和士气;它们是从消除返工触发因素中获得的好处。建议在设计阶段,项目参与者以及承包商、分包商和其他利益相关者之间需要明确、有效和及时的指示和信息传播,以避免遗漏和施工变更。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of rework risk triggers in the Nigerian construction industry
Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信