{"title":"基于模糊推理系统的银行软件开发项目风险管理模型的开发","authors":"Tooraj Karimi, M. Fathi, Yalda Yahyazade","doi":"10.22094/JOIE.2020.1883892.1700","DOIUrl":null,"url":null,"abstract":"Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed to design a risk management model that seeks to manage the risk of software development projects based on the key criteria of project time, cost, quality and scope. This is presented after making an extensive review of the literature and asking questions from experts in the field. In this regard, after identifying the risks and defining them based on the dimensions and indicators of software development projects, 22 features were identified to evaluate banking software projects. The data were collected for three consecutive years in the country's largest software development eco-system. According to Rough modelling, the most important variables affecting the cost, time, quality and scope of projects were identified and the amount of risk that a project may have in each of these dimensions was shown. Since traditional scales cannot provide the accurate estimation of project risk assessment under uncertainty, the indexes were fuzzy. Finally, the fuzzy expert system was designed by MATLAB software that showed the total risk of each project. To create a graphical user interface, the MATLAB software GUIDE was used. The system can predict the risks of each project before each project begins and helps project managers be prepared to deal with these risks and consider ways to prevent the project from failing. The results showed that quality and time risks were more important than cost and scope risks and had a greater impact on total project deviation.","PeriodicalId":36956,"journal":{"name":"Journal of Optimization in Industrial Engineering","volume":"13 1","pages":"267-278"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System\",\"authors\":\"Tooraj Karimi, M. Fathi, Yalda Yahyazade\",\"doi\":\"10.22094/JOIE.2020.1883892.1700\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed to design a risk management model that seeks to manage the risk of software development projects based on the key criteria of project time, cost, quality and scope. This is presented after making an extensive review of the literature and asking questions from experts in the field. In this regard, after identifying the risks and defining them based on the dimensions and indicators of software development projects, 22 features were identified to evaluate banking software projects. The data were collected for three consecutive years in the country's largest software development eco-system. According to Rough modelling, the most important variables affecting the cost, time, quality and scope of projects were identified and the amount of risk that a project may have in each of these dimensions was shown. Since traditional scales cannot provide the accurate estimation of project risk assessment under uncertainty, the indexes were fuzzy. Finally, the fuzzy expert system was designed by MATLAB software that showed the total risk of each project. To create a graphical user interface, the MATLAB software GUIDE was used. The system can predict the risks of each project before each project begins and helps project managers be prepared to deal with these risks and consider ways to prevent the project from failing. The results showed that quality and time risks were more important than cost and scope risks and had a greater impact on total project deviation.\",\"PeriodicalId\":36956,\"journal\":{\"name\":\"Journal of Optimization in Industrial Engineering\",\"volume\":\"13 1\",\"pages\":\"267-278\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Optimization in Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22094/JOIE.2020.1883892.1700\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Optimization in Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22094/JOIE.2020.1883892.1700","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

摘要

风险管理是项目管理中最具影响力的部分之一,对项目的成败有着重大影响。由于信息技术(IT)系统在各个领域的使用越来越多,并且IT项目在软件开发和生产中的失败率很高,因此有效管理这些项目至关重要。因此,本研究旨在设计一个风险管理模型,寻求基于项目时间、成本、质量和范围的关键标准来管理软件开发项目的风险。这是在对文献进行广泛综述并向该领域的专家提问后提出的。在这方面,在识别风险并根据软件开发项目的维度和指标进行定义后,确定了22个特征来评估银行软件项目。这些数据是在该国最大的软件开发生态系统中连续三年收集的。根据粗略建模,确定了影响项目成本、时间、质量和范围的最重要变量,并显示了项目在每个维度上可能存在的风险。由于传统的量表无法在不确定的情况下提供准确的项目风险评估估计,因此指标具有模糊性。最后,利用MATLAB软件设计了模糊专家系统,显示了各项目的总体风险。为了创建图形用户界面,使用了MATLAB软件GUIDE。该系统可以在每个项目开始前预测每个项目的风险,并帮助项目经理做好应对这些风险的准备,并考虑防止项目失败的方法。结果表明,质量和时间风险比成本和范围风险更重要,对项目总偏差的影响更大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed to design a risk management model that seeks to manage the risk of software development projects based on the key criteria of project time, cost, quality and scope. This is presented after making an extensive review of the literature and asking questions from experts in the field. In this regard, after identifying the risks and defining them based on the dimensions and indicators of software development projects, 22 features were identified to evaluate banking software projects. The data were collected for three consecutive years in the country's largest software development eco-system. According to Rough modelling, the most important variables affecting the cost, time, quality and scope of projects were identified and the amount of risk that a project may have in each of these dimensions was shown. Since traditional scales cannot provide the accurate estimation of project risk assessment under uncertainty, the indexes were fuzzy. Finally, the fuzzy expert system was designed by MATLAB software that showed the total risk of each project. To create a graphical user interface, the MATLAB software GUIDE was used. The system can predict the risks of each project before each project begins and helps project managers be prepared to deal with these risks and consider ways to prevent the project from failing. The results showed that quality and time risks were more important than cost and scope risks and had a greater impact on total project deviation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Optimization in Industrial Engineering
Journal of Optimization in Industrial Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
2.90
自引率
0.00%
发文量
0
审稿时长
32 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信