采购数据分析对周转维修程序的重新设计

W. N. Cahyo, Buchairi Zaman
{"title":"采购数据分析对周转维修程序的重新设计","authors":"W. N. Cahyo, Buchairi Zaman","doi":"10.21776/UB.JEMIS/2020.008.02.2","DOIUrl":null,"url":null,"abstract":"Turnaround (TA) is a large-scale maintenance activity (extraordinary maintenance activities), which is carried out periodically (repeated large-scale maintenance), where the work referred to can only be carried out when the unit is stopped operating. The main scope of work is inspection (inspection), repair, cleaning equipment. The success or failure of turnaround activities is very influential from careful preparation, some of the failures of turnaround activities result from unplanned preparations. One factor is the readiness of the material. This paper discusses the direct involvement of the material procurement process in determining better TA preparation time. The historical data from the purchasing is analyses and then the result is combined with the new proposed procedure of the TA maintenance. The new procedure has three months less than thecurrent procedure.","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALYSIS ON THE PURCHASING DATA TO RE-DESIGN THE PROCEDURE OF TURNAROUND MAINTENANCE\",\"authors\":\"W. N. Cahyo, Buchairi Zaman\",\"doi\":\"10.21776/UB.JEMIS/2020.008.02.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Turnaround (TA) is a large-scale maintenance activity (extraordinary maintenance activities), which is carried out periodically (repeated large-scale maintenance), where the work referred to can only be carried out when the unit is stopped operating. The main scope of work is inspection (inspection), repair, cleaning equipment. The success or failure of turnaround activities is very influential from careful preparation, some of the failures of turnaround activities result from unplanned preparations. One factor is the readiness of the material. This paper discusses the direct involvement of the material procurement process in determining better TA preparation time. The historical data from the purchasing is analyses and then the result is combined with the new proposed procedure of the TA maintenance. The new procedure has three months less than thecurrent procedure.\",\"PeriodicalId\":31715,\"journal\":{\"name\":\"Journal of Engineering and Management in Industrial System\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering and Management in Industrial System\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/UB.JEMIS/2020.008.02.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Management in Industrial System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/UB.JEMIS/2020.008.02.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

周转(TA)是一种定期进行的大规模维护活动(特殊维护活动)(重复大规模维护),其中所指的工作只能在机组停止运行时进行。主要工作范围为检查(检验)、修理、清洁设备。周转活动的成败很大程度上取决于精心的准备,周转活动的一些失败是由计划外的准备造成的。一个因素是材料的准备情况。本文讨论了材料采购过程在确定更好的TA准备时间方面的直接参与。对采购的历史数据进行分析,然后将结果与新提出的TA维护程序相结合。新程序比当前程序少了三个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALYSIS ON THE PURCHASING DATA TO RE-DESIGN THE PROCEDURE OF TURNAROUND MAINTENANCE
Turnaround (TA) is a large-scale maintenance activity (extraordinary maintenance activities), which is carried out periodically (repeated large-scale maintenance), where the work referred to can only be carried out when the unit is stopped operating. The main scope of work is inspection (inspection), repair, cleaning equipment. The success or failure of turnaround activities is very influential from careful preparation, some of the failures of turnaround activities result from unplanned preparations. One factor is the readiness of the material. This paper discusses the direct involvement of the material procurement process in determining better TA preparation time. The historical data from the purchasing is analyses and then the result is combined with the new proposed procedure of the TA maintenance. The new procedure has three months less than thecurrent procedure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信