斯卡蒙登大坝建设的回顾与思考(1966-1970)

Q4 Earth and Planetary Sciences
D. Parkinson, J. Charles
{"title":"斯卡蒙登大坝建设的回顾与思考(1966-1970)","authors":"D. Parkinson, J. Charles","doi":"10.1680/jdare.23.00102","DOIUrl":null,"url":null,"abstract":"Scammonden dam has been described as a unique structure with its large embankment not only forming part of the M62 motorway but also impounding a reservoir. This paper presents the recollections and reflections on this huge project from the viewpoint of its two authors who were present on the site for most of the construction period; one of the authors, who is a Highway Engineer, was the Materials Engineer for the main contractor, Sir Alfred McAlpine & Son, and the other author, who is a Geotechnical Engineer, was much involved with some of the instrumentation. The important role of the contractor in sourcing materials for the embankment is described. Each author made a significant contribution in a sequence of events which arose towards the end of embankment construction. This began with identifying an issue relating to the extremely high pore-water pressures in the clay core and then in a preliminary assessment of the effect of this on upstream slope stability during the early stages of reservoir impounding.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Recollections and reflections on the construction of Scammonden Dam (1966-1970)\",\"authors\":\"D. Parkinson, J. Charles\",\"doi\":\"10.1680/jdare.23.00102\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scammonden dam has been described as a unique structure with its large embankment not only forming part of the M62 motorway but also impounding a reservoir. This paper presents the recollections and reflections on this huge project from the viewpoint of its two authors who were present on the site for most of the construction period; one of the authors, who is a Highway Engineer, was the Materials Engineer for the main contractor, Sir Alfred McAlpine & Son, and the other author, who is a Geotechnical Engineer, was much involved with some of the instrumentation. The important role of the contractor in sourcing materials for the embankment is described. Each author made a significant contribution in a sequence of events which arose towards the end of embankment construction. This began with identifying an issue relating to the extremely high pore-water pressures in the clay core and then in a preliminary assessment of the effect of this on upstream slope stability during the early stages of reservoir impounding.\",\"PeriodicalId\":39070,\"journal\":{\"name\":\"Dams and Reservoirs\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dams and Reservoirs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jdare.23.00102\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.23.00102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

Scammonden大坝被描述为一种独特的结构,其大型路堤不仅构成M62高速公路的一部分,还蓄水。本文从两位在施工期间大部分时间都在现场的作者的角度,对这一庞大工程进行了回顾和思考;其中一位作者是公路工程师,是主承包商Alfred McAlpine&Son爵士的材料工程师,另一位作者也是岩土工程师,参与了一些仪器的工作。描述了承包商在采购路堤材料方面的重要作用。每一位作者都在路堤施工即将结束时发生的一系列事件中做出了重大贡献。这始于确定与粘土芯中极高孔隙水压力有关的问题,然后在水库蓄水早期阶段对其对上游边坡稳定性的影响进行初步评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Recollections and reflections on the construction of Scammonden Dam (1966-1970)
Scammonden dam has been described as a unique structure with its large embankment not only forming part of the M62 motorway but also impounding a reservoir. This paper presents the recollections and reflections on this huge project from the viewpoint of its two authors who were present on the site for most of the construction period; one of the authors, who is a Highway Engineer, was the Materials Engineer for the main contractor, Sir Alfred McAlpine & Son, and the other author, who is a Geotechnical Engineer, was much involved with some of the instrumentation. The important role of the contractor in sourcing materials for the embankment is described. Each author made a significant contribution in a sequence of events which arose towards the end of embankment construction. This began with identifying an issue relating to the extremely high pore-water pressures in the clay core and then in a preliminary assessment of the effect of this on upstream slope stability during the early stages of reservoir impounding.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信