{"title":"制造系统的维护和质量控制集成策略","authors":"Nadia Bahria, A. Chelbi, I. Dridi, H. Bouchriha","doi":"10.1504/EJIE.2018.092006","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of integration of maintenance and quality control in manufacturing systems which are subject to a degradation process that directly affects the quality of the produced items. Process and product quality control is carried out using an 'x-bar' control chart. According to the average of the measurements of the quality indicator x compared to monitoring and control limits, it is decided to undertake or not a maintenance action that can be either preventive or corrective. A mathematical model is developed to determine the optimal values of the decision variables that are: the sample size, the sampling interval, the number of samples, as well as the monitoring and the control limits of the control chart. The objective is to minimise the average total cost per time unit integrating maintenance and quality costs. A numerical example and a sensitivity analysis are presented to illustrate the proposed approach. [Received: 5 May 2017; Revised: 26 October 2017; Accepted: 23 December 2017]","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2018-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/EJIE.2018.092006","citationCount":"12","resultStr":"{\"title\":\"Maintenance and quality control integrated strategy for manufacturing systems\",\"authors\":\"Nadia Bahria, A. Chelbi, I. Dridi, H. Bouchriha\",\"doi\":\"10.1504/EJIE.2018.092006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the problem of integration of maintenance and quality control in manufacturing systems which are subject to a degradation process that directly affects the quality of the produced items. Process and product quality control is carried out using an 'x-bar' control chart. According to the average of the measurements of the quality indicator x compared to monitoring and control limits, it is decided to undertake or not a maintenance action that can be either preventive or corrective. A mathematical model is developed to determine the optimal values of the decision variables that are: the sample size, the sampling interval, the number of samples, as well as the monitoring and the control limits of the control chart. The objective is to minimise the average total cost per time unit integrating maintenance and quality costs. A numerical example and a sensitivity analysis are presented to illustrate the proposed approach. [Received: 5 May 2017; Revised: 26 October 2017; Accepted: 23 December 2017]\",\"PeriodicalId\":1,\"journal\":{\"name\":\"Accounts of Chemical Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":16.4000,\"publicationDate\":\"2018-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1504/EJIE.2018.092006\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Accounts of Chemical Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1504/EJIE.2018.092006\",\"RegionNum\":1,\"RegionCategory\":\"化学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CHEMISTRY, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.092006","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
Maintenance and quality control integrated strategy for manufacturing systems
This paper addresses the problem of integration of maintenance and quality control in manufacturing systems which are subject to a degradation process that directly affects the quality of the produced items. Process and product quality control is carried out using an 'x-bar' control chart. According to the average of the measurements of the quality indicator x compared to monitoring and control limits, it is decided to undertake or not a maintenance action that can be either preventive or corrective. A mathematical model is developed to determine the optimal values of the decision variables that are: the sample size, the sampling interval, the number of samples, as well as the monitoring and the control limits of the control chart. The objective is to minimise the average total cost per time unit integrating maintenance and quality costs. A numerical example and a sensitivity analysis are presented to illustrate the proposed approach. [Received: 5 May 2017; Revised: 26 October 2017; Accepted: 23 December 2017]
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.