{"title":"火灾前、火灾中和火灾后具有钢榫连接的胶合木梁-梁组件的热机械性能","authors":"Milad Shabanian, N. Braxtan","doi":"10.1108/jsfe-04-2021-0018","DOIUrl":null,"url":null,"abstract":"PurposeThe purpose of this paper is to investigate the thermo-mechanical behavior of intermediate-size glued-laminated beam-to-girder assemblies connected with T-shaped slotted-in steel doweled connections at ambient temperature (AT), after and during non-standard fire exposure.Design/methodology/approachAT tests were performed using a universal testing machine (UTM) to evaluate the load-carrying capacity and failure modes of the assembly at room temperature. Post-fire-performance (PFP) tests were conducted to study the impact of 30-min and 60-min partial exposure to a non-standard fire on the residual strength of the assemblies. The assemblies were subject to fire in a custom-designed frame, then cooled and loaded to failure in the UTM. A fire-performance test was conducted to investigate the fire-resistance during non-standard fire exposure by simultaneously applying fire and mechanical load with the custom frame.FindingsAt AT, embedment failure of the dowels followed by brittle splitting failure were found to be the dominant failure modes in the beams. In the PFP tests, embedment failure and plastic bending of the dowels were the only observed failure modes. The residual strength of the assembly was reduced by 23.7% after 30-min and 47.8% after 60-min of fire exposure. Ductile embedment failure of the timber in contact with the dowels was the only failure mode observed during the fire-performance test, with the maximum rate of displacement at 57 min into the fire.Originality/valueData are presented for full-contact (no gap) connections in Glulam assemblies. PFP results are first to be published.","PeriodicalId":45033,"journal":{"name":"Journal of Structural Fire Engineering","volume":" ","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2022-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Thermo-mechanical behavior of Glulam beam-to-girder assemblies with steel doweled connections before, during and after fire\",\"authors\":\"Milad Shabanian, N. Braxtan\",\"doi\":\"10.1108/jsfe-04-2021-0018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThe purpose of this paper is to investigate the thermo-mechanical behavior of intermediate-size glued-laminated beam-to-girder assemblies connected with T-shaped slotted-in steel doweled connections at ambient temperature (AT), after and during non-standard fire exposure.Design/methodology/approachAT tests were performed using a universal testing machine (UTM) to evaluate the load-carrying capacity and failure modes of the assembly at room temperature. Post-fire-performance (PFP) tests were conducted to study the impact of 30-min and 60-min partial exposure to a non-standard fire on the residual strength of the assemblies. The assemblies were subject to fire in a custom-designed frame, then cooled and loaded to failure in the UTM. A fire-performance test was conducted to investigate the fire-resistance during non-standard fire exposure by simultaneously applying fire and mechanical load with the custom frame.FindingsAt AT, embedment failure of the dowels followed by brittle splitting failure were found to be the dominant failure modes in the beams. In the PFP tests, embedment failure and plastic bending of the dowels were the only observed failure modes. The residual strength of the assembly was reduced by 23.7% after 30-min and 47.8% after 60-min of fire exposure. Ductile embedment failure of the timber in contact with the dowels was the only failure mode observed during the fire-performance test, with the maximum rate of displacement at 57 min into the fire.Originality/valueData are presented for full-contact (no gap) connections in Glulam assemblies. PFP results are first to be published.\",\"PeriodicalId\":45033,\"journal\":{\"name\":\"Journal of Structural Fire Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2022-01-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Structural Fire Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jsfe-04-2021-0018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Structural Fire Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jsfe-04-2021-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 3

摘要

目的本文的目的是研究在环境温度(at)下、非标准火灾暴露后和非标准火灾期间,用T形开槽钢榫连接的中等尺寸胶合层合梁-梁组件的热机械性能。使用通用试验机(UTM)进行设计/方法/方法at试验,以评估组件在室温下的承载能力和失效模式。进行了火灾后性能(PFP)测试,以研究部分暴露于非标准火灾30分钟和60分钟对组件残余强度的影响。这些组件在定制设计的框架中发生火灾,然后在UTM中冷却并加载至故障。通过对定制框架同时施加火灾和机械载荷,进行了防火性能测试,以研究非标准火灾暴露期间的耐火性。发现在AT处,插筋的嵌入失效和脆性劈裂失效是梁的主要失效模式。在PFP试验中,嵌入失效和销钉的塑性弯曲是唯一观察到的失效模式。组件的残余强度在火灾暴露30分钟后降低23.7%,在60分钟后降低47.8%。与销钉接触的木材的延性嵌入失效是防火性能测试期间观察到的唯一失效模式,最大位移率为57分钟。独创性/价值Glulam组件中全接触(无间隙)连接的数据。PFP结果首次公布。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Thermo-mechanical behavior of Glulam beam-to-girder assemblies with steel doweled connections before, during and after fire
PurposeThe purpose of this paper is to investigate the thermo-mechanical behavior of intermediate-size glued-laminated beam-to-girder assemblies connected with T-shaped slotted-in steel doweled connections at ambient temperature (AT), after and during non-standard fire exposure.Design/methodology/approachAT tests were performed using a universal testing machine (UTM) to evaluate the load-carrying capacity and failure modes of the assembly at room temperature. Post-fire-performance (PFP) tests were conducted to study the impact of 30-min and 60-min partial exposure to a non-standard fire on the residual strength of the assemblies. The assemblies were subject to fire in a custom-designed frame, then cooled and loaded to failure in the UTM. A fire-performance test was conducted to investigate the fire-resistance during non-standard fire exposure by simultaneously applying fire and mechanical load with the custom frame.FindingsAt AT, embedment failure of the dowels followed by brittle splitting failure were found to be the dominant failure modes in the beams. In the PFP tests, embedment failure and plastic bending of the dowels were the only observed failure modes. The residual strength of the assembly was reduced by 23.7% after 30-min and 47.8% after 60-min of fire exposure. Ductile embedment failure of the timber in contact with the dowels was the only failure mode observed during the fire-performance test, with the maximum rate of displacement at 57 min into the fire.Originality/valueData are presented for full-contact (no gap) connections in Glulam assemblies. PFP results are first to be published.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Structural Fire Engineering
Journal of Structural Fire Engineering CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
2.20
自引率
10.00%
发文量
28
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信