标准工作对领导者在精益实施过程中减少未使用的员工创造力的影响

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL
Michael Mogaramedi, H. Nel, A. Marnewick
{"title":"标准工作对领导者在精益实施过程中减少未使用的员工创造力的影响","authors":"Michael Mogaramedi, H. Nel, A. Marnewick","doi":"10.7166/31-2-1842","DOIUrl":null,"url":null,"abstract":"Organisations implement lean in production to improve continuously, but implementation may be unsuccessful due to ineffective leadership. Also, organisations have not eliminated the eighth lean waste — namely, the waste of unused employee creativity. The research investigated standard work for leaders in reducing unused employee creativity. The case study, conducted in an automobile manufacturer, indicated that worker ideas increased when employees were trained in lean, and when standard work for leaders was implemented. The research concluded that standard work for leaders reduces the waste of unused employee creativity, and suggests a lean implementation model that can be validated with further work.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"31 1","pages":"1-10"},"PeriodicalIF":0.5000,"publicationDate":"2020-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"IMPACT OF STANDARD WORK FOR LEADERS ON REDUCING UNUSED EMPLOYEE CREATIVITY DURING LEAN IMPLEMENTATION\",\"authors\":\"Michael Mogaramedi, H. Nel, A. Marnewick\",\"doi\":\"10.7166/31-2-1842\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Organisations implement lean in production to improve continuously, but implementation may be unsuccessful due to ineffective leadership. Also, organisations have not eliminated the eighth lean waste — namely, the waste of unused employee creativity. The research investigated standard work for leaders in reducing unused employee creativity. The case study, conducted in an automobile manufacturer, indicated that worker ideas increased when employees were trained in lean, and when standard work for leaders was implemented. The research concluded that standard work for leaders reduces the waste of unused employee creativity, and suggests a lean implementation model that can be validated with further work.\",\"PeriodicalId\":49493,\"journal\":{\"name\":\"South African Journal of Industrial Engineering\",\"volume\":\"31 1\",\"pages\":\"1-10\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2020-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"South African Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7166/31-2-1842\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/31-2-1842","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

摘要

组织实施精益生产以持续改进,但由于领导不力,实施可能会失败。此外,组织还没有消除第八种精益浪费,即未使用的员工创造力的浪费。这项研究调查了领导者在减少未使用的员工创造力方面的标准工作。这项在一家汽车制造商进行的案例研究表明,当员工接受精益培训时,以及当领导者的标准工作得到实施时,员工的想法就会增加。该研究得出结论,领导者的标准工作减少了未使用的员工创造力的浪费,并提出了一种可以通过进一步工作验证的精益实施模式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IMPACT OF STANDARD WORK FOR LEADERS ON REDUCING UNUSED EMPLOYEE CREATIVITY DURING LEAN IMPLEMENTATION
Organisations implement lean in production to improve continuously, but implementation may be unsuccessful due to ineffective leadership. Also, organisations have not eliminated the eighth lean waste — namely, the waste of unused employee creativity. The research investigated standard work for leaders in reducing unused employee creativity. The case study, conducted in an automobile manufacturer, indicated that worker ideas increased when employees were trained in lean, and when standard work for leaders was implemented. The research concluded that standard work for leaders reduces the waste of unused employee creativity, and suggests a lean implementation model that can be validated with further work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信