{"title":"高速公路作业区交通需求估算","authors":"E. Kwon, Chongmyung Park","doi":"10.17265/2328-2142/2021.01.004","DOIUrl":null,"url":null,"abstract":"An iterative process, combining a macroscopic simulator and a set of the traffic demand-change estimation models, is developed to estimate the traffic demand at work zones in urban freeway corridors. The process is designed to capture the interaction between work-zone conditions and traffic diversion in determining the traffic demand approaching the entrance and exit ramps at a given work zone. The proposed models and process were calibrated and tested with the field data from the work zones in the Minnesota metro-freeway network. The test results indicate promising possibilities of the proposed process in terms of the estimation accuracy and transferability of the demand-change estimation models developed in this study.","PeriodicalId":62390,"journal":{"name":"交通与运输工程:英文版","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of Traffic Demand at Freeway Work Zones\",\"authors\":\"E. Kwon, Chongmyung Park\",\"doi\":\"10.17265/2328-2142/2021.01.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An iterative process, combining a macroscopic simulator and a set of the traffic demand-change estimation models, is developed to estimate the traffic demand at work zones in urban freeway corridors. The process is designed to capture the interaction between work-zone conditions and traffic diversion in determining the traffic demand approaching the entrance and exit ramps at a given work zone. The proposed models and process were calibrated and tested with the field data from the work zones in the Minnesota metro-freeway network. The test results indicate promising possibilities of the proposed process in terms of the estimation accuracy and transferability of the demand-change estimation models developed in this study.\",\"PeriodicalId\":62390,\"journal\":{\"name\":\"交通与运输工程:英文版\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"交通与运输工程:英文版\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.17265/2328-2142/2021.01.004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"交通与运输工程:英文版","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.17265/2328-2142/2021.01.004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Estimation of Traffic Demand at Freeway Work Zones
An iterative process, combining a macroscopic simulator and a set of the traffic demand-change estimation models, is developed to estimate the traffic demand at work zones in urban freeway corridors. The process is designed to capture the interaction between work-zone conditions and traffic diversion in determining the traffic demand approaching the entrance and exit ramps at a given work zone. The proposed models and process were calibrated and tested with the field data from the work zones in the Minnesota metro-freeway network. The test results indicate promising possibilities of the proposed process in terms of the estimation accuracy and transferability of the demand-change estimation models developed in this study.