Frisca Pomalia, I. Iftadi, Rahmaniyah Dwi Astuti
{"title":"第117架NC212i飞机壁板组机身总成废料分析","authors":"Frisca Pomalia, I. Iftadi, Rahmaniyah Dwi Astuti","doi":"10.30656/jsmi.v4i1.2187","DOIUrl":null,"url":null,"abstract":"Dirgantara Indonesia (PTDI) is the single source producer of the NC212i Aircraft. Almost every Aircraft is delivered to the customer over the deadline date. The existence of waste is believed to be one of causing the late delivery. Based on observations of the 117th NC212i Aircraft assembly line, which is precisely at the fuselage assembly in the paneling group, six wastes are identified: waiting, transportation, overprocessing, inventory, and motion. Waste of overproduction does not occur because PTDI applies MTO (Make to Order) system. These 6 wastes are then processed using Waste Assessment Model (WAM). The ranking result is: first place is 25% for defects, second place is 23% for waiting, third place is 17% for motion, fourth place is 15% for inventory, fifth place is 13% for transportation, sixth place is 8% for overprocessing, and seventh place is 0% for overproduction. Three critical wastes based Pareto principle can be minimized, so the delay of aircraft delivery can be reduced.","PeriodicalId":53057,"journal":{"name":"Jurnal Sistem dan Manajemen Industri","volume":"4 1","pages":"61-71"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Waste analysis of fuselage assembly in panelization group of the 117th NC212i aircraft\",\"authors\":\"Frisca Pomalia, I. Iftadi, Rahmaniyah Dwi Astuti\",\"doi\":\"10.30656/jsmi.v4i1.2187\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Dirgantara Indonesia (PTDI) is the single source producer of the NC212i Aircraft. Almost every Aircraft is delivered to the customer over the deadline date. The existence of waste is believed to be one of causing the late delivery. Based on observations of the 117th NC212i Aircraft assembly line, which is precisely at the fuselage assembly in the paneling group, six wastes are identified: waiting, transportation, overprocessing, inventory, and motion. Waste of overproduction does not occur because PTDI applies MTO (Make to Order) system. These 6 wastes are then processed using Waste Assessment Model (WAM). The ranking result is: first place is 25% for defects, second place is 23% for waiting, third place is 17% for motion, fourth place is 15% for inventory, fifth place is 13% for transportation, sixth place is 8% for overprocessing, and seventh place is 0% for overproduction. Three critical wastes based Pareto principle can be minimized, so the delay of aircraft delivery can be reduced.\",\"PeriodicalId\":53057,\"journal\":{\"name\":\"Jurnal Sistem dan Manajemen Industri\",\"volume\":\"4 1\",\"pages\":\"61-71\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Sistem dan Manajemen Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30656/jsmi.v4i1.2187\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem dan Manajemen Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30656/jsmi.v4i1.2187","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

Dirgantara Indonesia (PTDI)是NC212i飞机的单一来源生产商。几乎每架飞机都在截止日期前交付给了客户。浪费的存在被认为是造成延迟交货的原因之一。根据对117号NC212i飞机总装线的观察,确切地说,是在镶板组的机身总装线,确定了六种浪费:等待,运输,过度加工,库存和运动。由于PTDI采用了MTO(订制)系统,所以不会产生生产过剩的浪费。然后使用废物评估模型(WAM)处理这6种废物。排名结果是:第一名是缺陷占25%,第二名是等待占23%,第三名是运动占17%,第四名是库存占15%,第五名是运输占13%,第六名是过度加工占8%,第七名是生产过剩占0%。基于Pareto原理的三种关键浪费可以最小化,从而减少飞机交付的延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Waste analysis of fuselage assembly in panelization group of the 117th NC212i aircraft
Dirgantara Indonesia (PTDI) is the single source producer of the NC212i Aircraft. Almost every Aircraft is delivered to the customer over the deadline date. The existence of waste is believed to be one of causing the late delivery. Based on observations of the 117th NC212i Aircraft assembly line, which is precisely at the fuselage assembly in the paneling group, six wastes are identified: waiting, transportation, overprocessing, inventory, and motion. Waste of overproduction does not occur because PTDI applies MTO (Make to Order) system. These 6 wastes are then processed using Waste Assessment Model (WAM). The ranking result is: first place is 25% for defects, second place is 23% for waiting, third place is 17% for motion, fourth place is 15% for inventory, fifth place is 13% for transportation, sixth place is 8% for overprocessing, and seventh place is 0% for overproduction. Three critical wastes based Pareto principle can be minimized, so the delay of aircraft delivery can be reduced.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
10
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信