{"title":"管理灾后重建项目的关键成功因素:安哥拉的案例","authors":"Nyamagere Gladys Sospeter, P. Rwelamila, Joaquim J. Gimbi","doi":"10.5130/ajceb.v20i3.7298","DOIUrl":null,"url":null,"abstract":"Although some studies have been carried out on project management of “typical” construction projects, little work has been done on what makes Post-Disaster Reconstruction Projects (PDRPs) successful. This paper analyses the Critical Success Factors (CSFs) for implementation of PDRPs in Angola. The paper adopted a survey and interviews. Data was collected from project participants within the ministry of planning, provincial government office of planning and local government in Angola. A questionnaire with closed questions was completed by 130 survey respondents. Semi-structured interviews were conducted with 7 practitioners selected through purposive sampling. The findings indicate that adequate funding, effective planning, competent project managers, good communication, the active involvement of stakeholders, good written contract, political stability, less bureaucracy in the reconstruction process, economic stability and sufficient resources are the CSFs. The findings further revealed that, there are no differences in the responses between the groups especially between managers and consultants and between contractors and consultants. The findings strongly suggest that CSFs are key resources and skills that determine the successful implementation of a project in terms of its direction and benefits and proposes that stakeholders and project managers should consider these factors for best practices when managing PDRPs. Since PDR is context specific, countries with the same economic status, environment and post-disaster event may benefit from the results. Hence, the study offers new insights to gain an understanding of the CSFs that contribute to best PDR practices.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2020-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5130/ajceb.v20i3.7298","citationCount":"5","resultStr":"{\"title\":\"Critical success factors for managing post-disaster reconstruction projects: the case of Angola\",\"authors\":\"Nyamagere Gladys Sospeter, P. Rwelamila, Joaquim J. Gimbi\",\"doi\":\"10.5130/ajceb.v20i3.7298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Although some studies have been carried out on project management of “typical” construction projects, little work has been done on what makes Post-Disaster Reconstruction Projects (PDRPs) successful. This paper analyses the Critical Success Factors (CSFs) for implementation of PDRPs in Angola. The paper adopted a survey and interviews. Data was collected from project participants within the ministry of planning, provincial government office of planning and local government in Angola. A questionnaire with closed questions was completed by 130 survey respondents. Semi-structured interviews were conducted with 7 practitioners selected through purposive sampling. The findings indicate that adequate funding, effective planning, competent project managers, good communication, the active involvement of stakeholders, good written contract, political stability, less bureaucracy in the reconstruction process, economic stability and sufficient resources are the CSFs. The findings further revealed that, there are no differences in the responses between the groups especially between managers and consultants and between contractors and consultants. The findings strongly suggest that CSFs are key resources and skills that determine the successful implementation of a project in terms of its direction and benefits and proposes that stakeholders and project managers should consider these factors for best practices when managing PDRPs. Since PDR is context specific, countries with the same economic status, environment and post-disaster event may benefit from the results. Hence, the study offers new insights to gain an understanding of the CSFs that contribute to best PDR practices.\",\"PeriodicalId\":51729,\"journal\":{\"name\":\"Construction Economics and Building\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2020-09-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.5130/ajceb.v20i3.7298\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Economics and Building\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5130/ajceb.v20i3.7298\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v20i3.7298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Critical success factors for managing post-disaster reconstruction projects: the case of Angola
Although some studies have been carried out on project management of “typical” construction projects, little work has been done on what makes Post-Disaster Reconstruction Projects (PDRPs) successful. This paper analyses the Critical Success Factors (CSFs) for implementation of PDRPs in Angola. The paper adopted a survey and interviews. Data was collected from project participants within the ministry of planning, provincial government office of planning and local government in Angola. A questionnaire with closed questions was completed by 130 survey respondents. Semi-structured interviews were conducted with 7 practitioners selected through purposive sampling. The findings indicate that adequate funding, effective planning, competent project managers, good communication, the active involvement of stakeholders, good written contract, political stability, less bureaucracy in the reconstruction process, economic stability and sufficient resources are the CSFs. The findings further revealed that, there are no differences in the responses between the groups especially between managers and consultants and between contractors and consultants. The findings strongly suggest that CSFs are key resources and skills that determine the successful implementation of a project in terms of its direction and benefits and proposes that stakeholders and project managers should consider these factors for best practices when managing PDRPs. Since PDR is context specific, countries with the same economic status, environment and post-disaster event may benefit from the results. Hence, the study offers new insights to gain an understanding of the CSFs that contribute to best PDR practices.
期刊介绍:
Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.