混合防波堤-集成波能转换器的研制与评价

Q3 Engineering
T. Calheiros-Cabral, A. Majidi, V. Ramos, Gianmaria Giannini, P. Rosa-Santos, F. Taveira-Pinto
{"title":"混合防波堤-集成波能转换器的研制与评价","authors":"T. Calheiros-Cabral, A. Majidi, V. Ramos, Gianmaria Giannini, P. Rosa-Santos, F. Taveira-Pinto","doi":"10.36688/imej.5.281-291","DOIUrl":null,"url":null,"abstract":"Harnessing and using marine renewable energy at seaports is a promising solution to put these energy-intensive infrastructures on the right track to energy self-sufficiency and environmental sustainability, reducing their carbon footprint. This paper presents a summary of the main conclusions and achievements of a recently concluded R&D project that encompassed the experimental study of an innovative hybrid wave energy converter integrated into a case-study rubble-mound breakwater in the Port of Leixões, Portugal. It also describes the prospective studies planned in two ongoing projects, PORTOS – Ports Towards Energy Self-Sufficiency and WEC4Ports – A hybrid Wave Energy Converter for Ports, intended to further develop and assess this promising technology. It has been demonstrated that its wave-to-wire efficiency and annual energy production are 27.3% and 35.0 MWh/m per year, respectively, for the case-study location. Hence, a 240 m long device could provide more than half of the port’s electricity consumption, which vows for the device’s potential. Moreover, the impact of its integration into the case-study breakwater showed that it leads to a 50% reduction of overtopping discharges over the structure, and no significant effects on the structure’s wave reflection, although the stability of the toe berm blocks was negatively impacted. Overall, the conclusions obtained are favourable to the integration of this technology into rubble-mound breakwaters. Notwithstanding, further research is still needed, namely in terms of wave forces acting upon the structure, important for the assessment of the functional performance and lifecycle readiness of the technology, and the use of PTO control strategies. This is being addressed in PORTOS and WEC4Ports projects.","PeriodicalId":36111,"journal":{"name":"International Marine Energy Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Development and Assessment of a Hybrid Breakwater-Integrated Wave Energy Converter\",\"authors\":\"T. Calheiros-Cabral, A. Majidi, V. Ramos, Gianmaria Giannini, P. Rosa-Santos, F. Taveira-Pinto\",\"doi\":\"10.36688/imej.5.281-291\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Harnessing and using marine renewable energy at seaports is a promising solution to put these energy-intensive infrastructures on the right track to energy self-sufficiency and environmental sustainability, reducing their carbon footprint. This paper presents a summary of the main conclusions and achievements of a recently concluded R&D project that encompassed the experimental study of an innovative hybrid wave energy converter integrated into a case-study rubble-mound breakwater in the Port of Leixões, Portugal. It also describes the prospective studies planned in two ongoing projects, PORTOS – Ports Towards Energy Self-Sufficiency and WEC4Ports – A hybrid Wave Energy Converter for Ports, intended to further develop and assess this promising technology. It has been demonstrated that its wave-to-wire efficiency and annual energy production are 27.3% and 35.0 MWh/m per year, respectively, for the case-study location. Hence, a 240 m long device could provide more than half of the port’s electricity consumption, which vows for the device’s potential. Moreover, the impact of its integration into the case-study breakwater showed that it leads to a 50% reduction of overtopping discharges over the structure, and no significant effects on the structure’s wave reflection, although the stability of the toe berm blocks was negatively impacted. Overall, the conclusions obtained are favourable to the integration of this technology into rubble-mound breakwaters. Notwithstanding, further research is still needed, namely in terms of wave forces acting upon the structure, important for the assessment of the functional performance and lifecycle readiness of the technology, and the use of PTO control strategies. This is being addressed in PORTOS and WEC4Ports projects.\",\"PeriodicalId\":36111,\"journal\":{\"name\":\"International Marine Energy Journal\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Marine Energy Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36688/imej.5.281-291\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Marine Energy Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36688/imej.5.281-291","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 4

摘要

在海港利用和使用海洋可再生能源是一个很有前途的解决方案,可以使这些能源密集型基础设施走上正确的轨道,实现能源自给自足和环境可持续性,减少碳足迹。本文概述了最近结束的一个研发项目的主要结论和成果,该项目包括将一种创新的混合波能转换器集成到葡萄牙Leixões港的一个案例研究碎石丘防波堤的实验研究。它还描述了两个正在进行的项目中计划进行的前瞻性研究,PORTOS -港口实现能源自给自足和WEC4Ports -港口混合波浪能量转换器,旨在进一步开发和评估这一有前途的技术。研究表明,在案例研究地点,其波线转换效率和年发电量分别为27.3%和35.0 MWh/m /年。因此,一个240米长的设备可以提供超过一半的港口电力消耗,这预示着该设备的潜力。此外,将其整合到案例研究防波堤中的影响表明,它导致结构上的过顶流量减少50%,并且对结构的波反射没有显著影响,尽管脚趾护堤块的稳定性受到负面影响。总的来说,所得结论有利于将该技术应用于碎石丘防波堤。尽管如此,仍然需要进一步的研究,即作用在结构上的波浪力,这对于评估该技术的功能性能和生命周期准备情况以及PTO控制策略的使用非常重要。这在PORTOS和WEC4Ports项目中得到了解决。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development and Assessment of a Hybrid Breakwater-Integrated Wave Energy Converter
Harnessing and using marine renewable energy at seaports is a promising solution to put these energy-intensive infrastructures on the right track to energy self-sufficiency and environmental sustainability, reducing their carbon footprint. This paper presents a summary of the main conclusions and achievements of a recently concluded R&D project that encompassed the experimental study of an innovative hybrid wave energy converter integrated into a case-study rubble-mound breakwater in the Port of Leixões, Portugal. It also describes the prospective studies planned in two ongoing projects, PORTOS – Ports Towards Energy Self-Sufficiency and WEC4Ports – A hybrid Wave Energy Converter for Ports, intended to further develop and assess this promising technology. It has been demonstrated that its wave-to-wire efficiency and annual energy production are 27.3% and 35.0 MWh/m per year, respectively, for the case-study location. Hence, a 240 m long device could provide more than half of the port’s electricity consumption, which vows for the device’s potential. Moreover, the impact of its integration into the case-study breakwater showed that it leads to a 50% reduction of overtopping discharges over the structure, and no significant effects on the structure’s wave reflection, although the stability of the toe berm blocks was negatively impacted. Overall, the conclusions obtained are favourable to the integration of this technology into rubble-mound breakwaters. Notwithstanding, further research is still needed, namely in terms of wave forces acting upon the structure, important for the assessment of the functional performance and lifecycle readiness of the technology, and the use of PTO control strategies. This is being addressed in PORTOS and WEC4Ports projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Marine Energy Journal
International Marine Energy Journal Engineering-Ocean Engineering
CiteScore
1.70
自引率
0.00%
发文量
24
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信