{"title":"基于遗传算法的海上风电场项目管理中时间-成本-质量权衡优化","authors":"G. Liu, E. Lee, R. Yuen","doi":"10.33430/v27n1thie-2019-0030","DOIUrl":null,"url":null,"abstract":"Time, cost and quality are major concerns in construction project management. To achieve a balance between time-cost and time-quality, a trade-off problem among time-cost-quality (TCQ) is proposed for optimisation by the application of a genetic algorithm (GA). A GA attempts to minimise a fitness function that describes the objective to be achieved. The fitness function is specifically designed according to the nature and characteristics of the construction project. By inputting the project parameters, the fitness function should be able to provide a balance between the time, cost and quality of the project. This study applied a GA to strategically search for the best project parameters for an offshore wind farm project to achieve a more accurate prediction for construction time, cost and quality of the project in the pre-construction stage. A series of practical mathematical models are developed through a review of previous studies based on specific merits, and a real offshore wind farm project is studied to identify and verify the applicability and viability of the mathematical models. After the process of optimisation, the results show that the output data is very close to the actual case in terms of construction time, cost and quality.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":"27 1","pages":"1-12"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Optimising the time-cost-quality (TCQ) trade-off in offshore wind farm project\\nmanagement with a genetic algorithm (GA)\",\"authors\":\"G. Liu, E. Lee, R. Yuen\",\"doi\":\"10.33430/v27n1thie-2019-0030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Time, cost and quality are major concerns in construction project management. To achieve a balance between time-cost and time-quality, a trade-off problem among time-cost-quality (TCQ) is proposed for optimisation by the application of a genetic algorithm (GA). A GA attempts to minimise a fitness function that describes the objective to be achieved. The fitness function is specifically designed according to the nature and characteristics of the construction project. By inputting the project parameters, the fitness function should be able to provide a balance between the time, cost and quality of the project. This study applied a GA to strategically search for the best project parameters for an offshore wind farm project to achieve a more accurate prediction for construction time, cost and quality of the project in the pre-construction stage. A series of practical mathematical models are developed through a review of previous studies based on specific merits, and a real offshore wind farm project is studied to identify and verify the applicability and viability of the mathematical models. After the process of optimisation, the results show that the output data is very close to the actual case in terms of construction time, cost and quality.\",\"PeriodicalId\":35587,\"journal\":{\"name\":\"Transactions Hong Kong Institution of Engineers\",\"volume\":\"27 1\",\"pages\":\"1-12\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions Hong Kong Institution of Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33430/v27n1thie-2019-0030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33430/v27n1thie-2019-0030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
Optimising the time-cost-quality (TCQ) trade-off in offshore wind farm project
management with a genetic algorithm (GA)
Time, cost and quality are major concerns in construction project management. To achieve a balance between time-cost and time-quality, a trade-off problem among time-cost-quality (TCQ) is proposed for optimisation by the application of a genetic algorithm (GA). A GA attempts to minimise a fitness function that describes the objective to be achieved. The fitness function is specifically designed according to the nature and characteristics of the construction project. By inputting the project parameters, the fitness function should be able to provide a balance between the time, cost and quality of the project. This study applied a GA to strategically search for the best project parameters for an offshore wind farm project to achieve a more accurate prediction for construction time, cost and quality of the project in the pre-construction stage. A series of practical mathematical models are developed through a review of previous studies based on specific merits, and a real offshore wind farm project is studied to identify and verify the applicability and viability of the mathematical models. After the process of optimisation, the results show that the output data is very close to the actual case in terms of construction time, cost and quality.