{"title":"盾构隧道通过运营地铁隧道过程的动力响应分析","authors":"Jingyao Sun, Xingkai Pei, Cheng Yang, Binzhong Zhu","doi":"10.56748/ejse.234433","DOIUrl":null,"url":null,"abstract":"In order to analyze the interaction between the operating subway tunnel and the utility tunnel under construction during the utility tunnel under-passing the subway tunnel, an operating tunnel-stratum-utility shield tunnel coupled dynamic calculation model is established taking the utility tunnel under construction under-passing the Guangzhou-Foshan line subway project as an example. And the interaction between the existing tunnel and utility tunnel was studied. The results show that the amplitude change of the vertical displacement, acceleration and additional vertical stress are most influenced by the under-passing shield tunnel when the train operating on one line, and the max changes are 0.01 mm, 0.03m/s2 and 1.5kPa, respectively. The vertical displacement and acceleration response generated by the train operation during the excavation of the new tunnel can be neglected, but the vertical additional stress will have the max change of 2.1kPa. The closer the distance between the train load to the new and old tunnel structures are, the greater the displacement, acceleration and additional stresses of the new and old tunnel structures are when the trains are running in different lines. Structural safety calculations show that the old and new tunnel structures are safe during the utility shield tunnel under-passing. The study can provide useful reference for the construction and operation of similar tunnels.","PeriodicalId":52513,"journal":{"name":"Electronic Journal of Structural Engineering","volume":" ","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dynamic response analysis of the process of the utility shield tunnel under-passing the operating subway tunnel\",\"authors\":\"Jingyao Sun, Xingkai Pei, Cheng Yang, Binzhong Zhu\",\"doi\":\"10.56748/ejse.234433\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to analyze the interaction between the operating subway tunnel and the utility tunnel under construction during the utility tunnel under-passing the subway tunnel, an operating tunnel-stratum-utility shield tunnel coupled dynamic calculation model is established taking the utility tunnel under construction under-passing the Guangzhou-Foshan line subway project as an example. And the interaction between the existing tunnel and utility tunnel was studied. The results show that the amplitude change of the vertical displacement, acceleration and additional vertical stress are most influenced by the under-passing shield tunnel when the train operating on one line, and the max changes are 0.01 mm, 0.03m/s2 and 1.5kPa, respectively. The vertical displacement and acceleration response generated by the train operation during the excavation of the new tunnel can be neglected, but the vertical additional stress will have the max change of 2.1kPa. The closer the distance between the train load to the new and old tunnel structures are, the greater the displacement, acceleration and additional stresses of the new and old tunnel structures are when the trains are running in different lines. Structural safety calculations show that the old and new tunnel structures are safe during the utility shield tunnel under-passing. The study can provide useful reference for the construction and operation of similar tunnels.\",\"PeriodicalId\":52513,\"journal\":{\"name\":\"Electronic Journal of Structural Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2023-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electronic Journal of Structural Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56748/ejse.234433\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electronic Journal of Structural Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56748/ejse.234433","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

为了分析在用隧道穿越地铁隧道过程中,在用隧道与在建隧道的相互作用,以广佛线地铁工程在建隧道为例,建立了在用隧道-地层-盾构-隧道耦合动力计算模型。并对既有隧道与公用工程隧道之间的相互作用进行了研究。结果表明,当列车在一条线路上运行时,盾构隧道对垂直位移、加速度和附加垂直应力的振幅变化影响最大,最大变化分别为0.01mm、0.03m/s2和1.5kPa。新隧道开挖过程中列车运行产生的垂直位移和加速度响应可以忽略,但垂直附加应力的最大变化为2.1kPa。列车荷载与新旧隧道结构的距离越近,位移越大,新旧隧道结构的加速度和附加应力是列车在不同线路上运行时产生的。结构安全计算表明,在盾构隧道贯通过程中,新旧隧道结构是安全的。该研究可为类似隧道的施工和运营提供有益的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dynamic response analysis of the process of the utility shield tunnel under-passing the operating subway tunnel
In order to analyze the interaction between the operating subway tunnel and the utility tunnel under construction during the utility tunnel under-passing the subway tunnel, an operating tunnel-stratum-utility shield tunnel coupled dynamic calculation model is established taking the utility tunnel under construction under-passing the Guangzhou-Foshan line subway project as an example. And the interaction between the existing tunnel and utility tunnel was studied. The results show that the amplitude change of the vertical displacement, acceleration and additional vertical stress are most influenced by the under-passing shield tunnel when the train operating on one line, and the max changes are 0.01 mm, 0.03m/s2 and 1.5kPa, respectively. The vertical displacement and acceleration response generated by the train operation during the excavation of the new tunnel can be neglected, but the vertical additional stress will have the max change of 2.1kPa. The closer the distance between the train load to the new and old tunnel structures are, the greater the displacement, acceleration and additional stresses of the new and old tunnel structures are when the trains are running in different lines. Structural safety calculations show that the old and new tunnel structures are safe during the utility shield tunnel under-passing. The study can provide useful reference for the construction and operation of similar tunnels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Electronic Journal of Structural Engineering
Electronic Journal of Structural Engineering Engineering-Civil and Structural Engineering
CiteScore
1.10
自引率
16.70%
发文量
0
期刊介绍: The Electronic Journal of Structural Engineering (EJSE) is an international forum for the dissemination and discussion of leading edge research and practical applications in Structural Engineering. It comprises peer-reviewed technical papers, discussions and comments, and also news about conferences, workshops etc. in Structural Engineering. Original papers are invited from individuals involved in the field of structural engineering and construction. The areas of special interests include the following, but are not limited to: Analytical and design methods Bridges and High-rise Buildings Case studies and failure investigation Innovations in design and new technology New Construction Materials Performance of Structures Prefabrication Technology Repairs, Strengthening, and Maintenance Stability and Scaffolding Engineering Soil-structure interaction Standards and Codes of Practice Structural and solid mechanics Structural Safety and Reliability Testing Technologies Vibration, impact and structural dynamics Wind and earthquake engineering. EJSE is seeking original papers (research or state-of the art reviews) of the highest quality for consideration for publication. The papers will be published within 3 to 6 months. The papers are expected to make a significant contribution to the research and development activities of the academic and professional engineering community.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信